A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem
From MaRDI portal
Publication:5438568
DOI10.1111/j.1475-3995.2007.00614.xzbMath1146.90415MaRDI QIDQ5438568
Publication date: 24 January 2008
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1111/j.1475-3995.2007.00614.x
90B35: Deterministic scheduling theory in operations research
90C59: Approximation methods and heuristics in mathematical programming
Related Items
Uses Software
Cites Work
- A two-phase hybrid metaheuristic for the vehicle routing problem with time windows
- The discrete time/cost trade-off problem: Extensions and heuristic procedures
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Active-guided evolution strategies for large-scale capacitated vehicle routing problems
- Scheduling subject to resource constraints: Classification and complexity
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
- An iterative scheduling technique for resource-constrained project scheduling
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- A new adaptive multi-start technique for combinatorial global optimizations
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- A multicriteria heuristic method to improve resource allocation in multiproject scheduling
- Evolutionary computing
- Evolution strategies. A comprehensive introduction
- Justification and RCPSP: a technique that pays
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
- A market-based multi-agent system model for decentralized multi-project scheduling
- Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem
- Resource-constrained project scheduling by simulated annealing
- A simulated annealing algorithm for resource constrained project scheduling problems
- An efficient multi-pass heuristic for project scheduling with constrained resources
- A self-adapting genetic algorithm for project scheduling under resource constraints
- Introduction to evolutionary computing
- Auction protocols for decentralized scheduling
- A competitive heuristic solution technique for resource-constrained project scheduling
- A robust genetic algorithm for resource allocation in project scheduling
- Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling
- Adaptive memory programming: a unified view of metaheuristics
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item