New summary measures and datasets for the multi-project scheduling problem
From MaRDI portal
Publication:2670516
DOI10.1016/J.EJOR.2021.10.006zbMATH Open1495.90085OpenAlexW3206019747MaRDI QIDQ2670516FDOQ2670516
Authors: Rob Van Eynde, Mario Vanhoucke
Publication date: 11 March 2022
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2021.10.006
Recommendations
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
- The multi-mode resource-constrained multi-project scheduling problem, The MISTA 2013 challenge
- PSPLIB -- a project scheduling problem library
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- A random generator of resource-constrained multi-project network problems
Cites Work
- DAGEN: A generator of testsets for project activity nets
- PSPLIB -- a project scheduling problem library
- A genetic algorithm for the resource constrained multi-project scheduling problem
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
- Matrices of zeros and ones with fixed row and column sum vectors
- An evaluation of the adequacy of project network generators with systematically sampled networks
- Rangen: A random network generator for activity-on-the-node networks
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Title not available (Why is that?)
- A decomposition theorem for partially ordered sets
- The multi-mode resource-constrained multi-project scheduling problem, The MISTA 2013 challenge
- Multi-Project Scheduling: Categorization of Heuristic Rules Performance
- A market-based multi-agent system model for decentralized multi-project scheduling
- A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling
- Discovering the suitability of optimisation algorithms by learning from evolved instances
- A Random Activity Network Generator
- Algorithms for constructing \((0,1)\)-matrices with prescribed row and column sum vectors
- A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem
- The risk of delay of a project in terms of the morphology of its network
- A random generator of resource-constrained multi-project network problems
- An exact composite lower bound strategy for the resource-constrained project scheduling problem
Cited In (8)
- On the summary measures for the resource-constrained project scheduling problem
- An empirical project forecasting accuracy framework using project regularity
- Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns
- The performance of priority rules for the dynamic stochastic resource-constrained multi-project scheduling problem: an experimental investigation
- New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms
- A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem
- The multi-mode resource-constrained multi-project scheduling problem, The MISTA 2013 challenge
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
Uses Software
This page was built for publication: New summary measures and datasets for the multi-project scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2670516)