An evaluation of the adequacy of project network generators with systematically sampled networks

From MaRDI portal
Publication:2463502

DOI10.1016/j.ejor.2007.03.032zbMath1149.90066OpenAlexW1963682203MaRDI QIDQ2463502

Broos Maenhout, Mario Vanhoucke, Dieter Debels, Luís V. Tavares, José Coelho

Publication date: 12 December 2007

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2007.03.032




Related Items (35)

An exact algorithm for an integrated project staffing problem with a homogeneous workforceA heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraintsA tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphsComputing project makespan distributions: Markovian PERT networks revisitedA reduction tree approach for the discrete time/cost trade-off problemAn exact composite lower bound strategy for the resource-constrained project scheduling problemA resource type analysis of the integrated project scheduling and personnel staffing problemGoing to the core of hard resource-constrained project scheduling instancesProject scheduling and equipment planning with random breakdownsAn analysis of network and resource indicators for resource-constrained project scheduling problem instancesNew summary measures and datasets for the multi-project scheduling problemImpacts of synergies on software project schedulingIntegrated time–cost tradeoff and resources leveling problems with allowed activity splittingThe impact of a limited budget on the corrective action taking processA prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problemA classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problemProject scheduling under the threat of catastrophic disruptionUsing resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problemNew resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithmsAn evolutionary approach for the nurse rerostering problemAn agency perspective for multi-mode project scheduling with time/cost trade-offsUsing earned value management and schedule risk analysis with resource constraints for project controlA nearest neighbour extension to project duration forecasting with artificial intelligenceA buffer control method for top-down project controlAn experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instancesResource-constrained project scheduling with activity splitting and setup timesExperimental evaluation of simulated annealing algorithms for the time-cost trade-off problemUsing schedule risk analysis with resource constraints for project controlA survey of variants and extensions of the resource-constrained project scheduling problemA new algorithm for resource-constrained project scheduling with breadth and depth of skillsWork Package Sizing and Project PerformanceOn the characterization and generation of nurse scheduling problem instancesA genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problemA decomposed branch-and-price procedure for integrating demand planning in personnel staffing problemsA Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling Problem


Uses Software


Cites Work




This page was built for publication: An evaluation of the adequacy of project network generators with systematically sampled networks