An evaluation of the adequacy of project network generators with systematically sampled networks
From MaRDI portal
Publication:2463502
DOI10.1016/j.ejor.2007.03.032zbMath1149.90066OpenAlexW1963682203MaRDI QIDQ2463502
Broos Maenhout, Mario Vanhoucke, Dieter Debels, Luís V. Tavares, José Coelho
Publication date: 12 December 2007
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2007.03.032
Deterministic network models in operations research (90B10) Stochastic scheduling theory in operations research (90B36)
Related Items (35)
An exact algorithm for an integrated project staffing problem with a homogeneous workforce ⋮ A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints ⋮ A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs ⋮ Computing project makespan distributions: Markovian PERT networks revisited ⋮ A reduction tree approach for the discrete time/cost trade-off problem ⋮ An exact composite lower bound strategy for the resource-constrained project scheduling problem ⋮ A resource type analysis of the integrated project scheduling and personnel staffing problem ⋮ Going to the core of hard resource-constrained project scheduling instances ⋮ Project scheduling and equipment planning with random breakdowns ⋮ An analysis of network and resource indicators for resource-constrained project scheduling problem instances ⋮ New summary measures and datasets for the multi-project scheduling problem ⋮ Impacts of synergies on software project scheduling ⋮ Integrated time–cost tradeoff and resources leveling problems with allowed activity splitting ⋮ The impact of a limited budget on the corrective action taking process ⋮ A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem ⋮ A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem ⋮ Project scheduling under the threat of catastrophic disruption ⋮ Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem ⋮ New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms ⋮ An evolutionary approach for the nurse rerostering problem ⋮ An agency perspective for multi-mode project scheduling with time/cost trade-offs ⋮ Using earned value management and schedule risk analysis with resource constraints for project control ⋮ A nearest neighbour extension to project duration forecasting with artificial intelligence ⋮ A buffer control method for top-down project control ⋮ An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances ⋮ Resource-constrained project scheduling with activity splitting and setup times ⋮ Experimental evaluation of simulated annealing algorithms for the time-cost trade-off problem ⋮ Using schedule risk analysis with resource constraints for project control ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ A new algorithm for resource-constrained project scheduling with breadth and depth of skills ⋮ Work Package Sizing and Project Performance ⋮ On the characterization and generation of nurse scheduling problem instances ⋮ A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem ⋮ A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems ⋮ A Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling Problem
Uses Software
Cites Work
- On the measurement of complexity in activity networks
- PSPLIB -- a project scheduling problem library
- The risk of delay of a project in terms of the morphology of its network
- Phase transitions in project scheduling
- A simulation and evaluation of earned value metrics to forecast the project duration
- On Dynamic Programming Methods for Assembly Line Balancing
- Optimal Reduction of Two-Terminal Directed Acyclic Graphs
- Coefficient of Network Complexity
- Project scheduling: The effects of problem structure on heuristic performance
- A Random Activity Network Generator
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
- An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Unnamed Item
- Unnamed Item
This page was built for publication: An evaluation of the adequacy of project network generators with systematically sampled networks