RanGen
From MaRDI portal
Software:26235
swMATH14333MaRDI QIDQ26235FDOQ26235
Author name not available (Why is that?)
Cited In (59)
- State-Variable Modeling for a Class of Two-Stage Stochastic Optimization Problems
- An analysis of network and resource indicators for resource-constrained project scheduling problem instances
- New summary measures and datasets for the multi-project scheduling problem
- Impacts of synergies on software project scheduling
- The Interaction Between Critical Chain Sequencing, Buffer Sizing, and Reactive Actions in a CC/BM Framework
- A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- Fast minimum float computation in activity networks under interval uncertainty
- A random generator of resource-constrained multi-project network problems
- Robust resource allocations in temporal networks
- Criticality analysis of activity networks under interval uncertainty
- Resource-constrained project scheduling with activity splitting and setup times
- The Generation of Experimental Data for Computational Testing in Optimization
- A survey of variants and extensions of the resource-constrained project scheduling problem
- A genetic algorithm for the robust resource leveling problem
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs
- Maximizing the expected net present value in a project with uncertain cash flows
- Using earned value management and schedule risk analysis with resource constraints for project control
- An effective heuristic for project scheduling with resource availability cost
- A buffer control method for top-down project control
- Sequential testing of \(n\)-out-of-\(n\) systems: precedence theorems and exact methods
- The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models
- Finding an optimal Nash equilibrium to the multi-agent project scheduling problem
- A classification of predictive-reactive project scheduling procedures
- Uniform random posets
- Precedence theorems and dynamic programming for the single-machine weighted tardiness problem
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
- Measuring time. Improving project performance using earned value management
- Incentive schemes for resolving Parkinson's law in project management
- Generating two-terminal directed acyclic graphs with a given complexity index by constraint logic programming
- Nash equilibrium solutions in multi-agent project scheduling with milestones
- Computing project makespan distributions: Markovian PERT networks revisited
- Exact algorithms for single-machine scheduling with time windows and precedence constraints
- The impact of a limited budget on the corrective action taking process
- Optimal crashing of an activity network with disruptions
- Scheduling Markovian PERT networks to maximize the net present value
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
- Price of anarchy and price of stability in multi-agent project scheduling
- Project scheduling under uncertainty: survey and research potentials
- Scheduling modular projects on a bottleneck resource
- The construction of stable project baseline schedules
- The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds
- Parallel machine scheduling with precedence constraints and setup times
- Resource constrained multi-project scheduling problem with resource transfer times
- Capital- and resource-constrained project scheduling with net present value optimization
- Title not available (Why is that?)
- Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem
- The preemptive stochastic resource-constrained project scheduling problem
- Due-date quotation model for manufacturing system scheduling under uncertainty
- New computational results for the discrete time/cost trade-off problem with time-switch constraints
- A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem
- An evaluation of the adequacy of project network generators with systematically sampled networks
- Rangen: A random network generator for activity-on-the-node networks
- Robust Quadratic Programming with Mixed-Integer Uncertainty
- Project selection, scheduling and resource allocation with time dependent returns
- A simulation and evaluation of earned value metrics to forecast the project duration
- A nearest neighbour extension to project duration forecasting with artificial intelligence
- A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search
- Polyhedral Results and Branch-and-Cut for the Resource Loading Problem
This page was built for software: RanGen