The construction of stable project baseline schedules
From MaRDI portal
(Redirected from The construction of stable project baseline schedules)
Recommendations
- Active and stable project scheduling
- The generation of stable project plans
- A term-based approach to project scheduling
- ENHANCEMENT OF SCHEDULING RELIABILITY IN BUILDING PROJECT USING THEORY OF CONSTRAINT
- A decomposition and optimization method for large-scale project schedules
- Scheduling resource-constrained projects with a flexible project structure
- Special issue: Project scheduling
- Time-constrained project scheduling
- A constraint-based method for project scheduling with time windows
- Scheduling of project networks
Cites work
- A Classified Bibliography Of Research On Stochastic Pert Networks: 1966-1987
- A network flow algorithm for just-in-time project scheduling
- A network flow computation for project cost curves
- Active and stable project scheduling
- Application of a technique for research and development program evaluation
- Critical-Path Planning and Scheduling: Mathematical Basis
- Criticality in Resource Constrained Networks
- scientific article; zbMATH DE number 3558962 (Why is no real title available?)
- scientific article; zbMATH DE number 1139028 (Why is no real title available?)
- Match-up scheduling under a machine breakdown
- Matchup Scheduling with Multiple Resources, Release Dates and Disruptions
- Multiple-project scheduling with controllable project duration and hard resource constraint: Some solvable cases
- Network flows. Theory, algorithms, and applications.
- On the optimal management of project risk
- One-machine rescheduling heuristics with efficiency and stability as criteria
- Procedures for providing robust gate assignments for arriving aircrafts
- Rescheduling of identical parallel machines under machine eligibility constraints.
- Robust discrete optimization and its applications
- The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure
- The resource constrained project scheduling problem with multiple crashable modes: An exact solution method
Cited in
(51)- Evaluating project completion time in project networks with discrete random activity durations
- The resource-constrained activity insertion problem with minimum and maximum time lags
- A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem
- Anchored reactive and proactive solutions to the CPM-scheduling problem
- Managing projects with uncertain deadlines
- The generation of stable project plans
- Project scheduling under uncertainty: survey and research potentials
- On the fallacy of averages in project risk management
- Self-imposed time windows in vehicle routing problems
- Using schedule risk analysis with resource constraints for project control
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem
- A fuzzy robustness measure for the scheduling of commissioned product development projects
- Non-indexability of the stochastic appointment scheduling problem
- Dominance-based linear formulation for the anchor-robust project scheduling problem
- Using earned value management and schedule risk analysis with resource constraints for project control
- Solve-and-robustify
- The proactive and reactive resource-constrained project scheduling problem
- Maximizing the number of jobs scheduled at their baseline starting times in case of machine failures
- Meta-heuristics for stable scheduling on a single machine
- The complexity of machine scheduling for stability with a single disrupted job
- Developing activity duration specification limits for effective project control
- Triage scheduling optimization for mass casualty and disaster response
- A genetic algorithm for the robust resource leveling problem
- A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
- Resource allocation by means of project networks: complexity results
- ENHANCEMENT OF SCHEDULING RELIABILITY IN BUILDING PROJECT USING THEORY OF CONSTRAINT
- Scenario-based approach for flexible resource loading under uncertainty
- Review of real-time vehicle schedule recovery methods in transportation services
- On the choice of baseline schedules for the discrete time/resource trade-off problem under stochastic environment
- Schedule default distributions and Bayesian estimation in airport construction master schedule management
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing
- \(\Gamma\)-robust optimization of project scheduling problems
- Project scheduling under the threat of catastrophic disruption
- Tabu search for proactive project scheduling problem with flexible resources
- Minimizing recovery cost of network optimization problems
- A heuristic approach for resource constrained project scheduling with uncertain activity durations
- Time slack-based techniques for robust project scheduling subject to resource uncertainty
- A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective
- Exact and heuristic methods for Anchor-Robust and Adjustable-Robust RCPSP
- Anchor-robust project scheduling with non-availability periods
- A buffer allocation evolutionary algorithm for resource-constrained projects with activity clusters
- Reactive scheduling of uncertain jobs with maximum time lags
- Anchored rescheduling problem with non-availability periods
- Improved black widow optimization algorithm for multi-objective hybrid flow shop batch-scheduling problem
- Constraint programming approaches for stochastic resource-constrained project scheduling problem subject to disruptions
- Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment
- Reactive and proactive single-machine scheduling to maintain a maximum number of starting times
- A robust approach for the single machine scheduling problem
- A classification of predictive-reactive project scheduling procedures
- Scheduling for stability in single-machine production systems
- A two-stage stochastic programming approach for project planning with uncertain activity durations
This page was built for publication: The construction of stable project baseline schedules
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1877894)