A heuristic approach for resource constrained project scheduling with uncertain activity durations
DOI10.1016/J.COR.2010.12.004zbMATH Open1208.90055OpenAlexW2006347382WikidataQ58921288 ScholiaQ58921288MaRDI QIDQ632677FDOQ632677
Authors: Maria Elena Bruni, Patrizia Beraldi, Francesca Guerriero, Erika Pinto
Publication date: 25 March 2011
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2010.12.004
Recommendations
- scientific article; zbMATH DE number 1487565
- scientific article; zbMATH DE number 1487564
- An approximate dynamic programming approach to project scheduling with uncertain resource availabilities
- scientific article; zbMATH DE number 1808554
- Resource-constrained project scheduling: A heuristic for the multi-mode case
- Resource-constrained project scheduling: A critical activity reordering heuristic
- scientific article; zbMATH DE number 4197725
- Development of a heuristic project scheduler under resource constraints
- A heuristic search algorithm for solving resource-constrained project scheduling problems
- Search Heuristics for Resource Constrained Project Scheduling
heuristicjoint chance constraints programmingrandom activity durationresource constrained project scheduling
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- PSPLIB -- a project scheduling problem library
- Title not available (Why is that?)
- Insertion techniques for static and dynamic resource-constrained project scheduling.
- Project scheduling under uncertainty: survey and research potentials
- The construction of stable project baseline schedules
- Proactive heuristic procedures for robust project scheduling: An experimental analysis
- Chance Constrained Programming with Joint Constraints
- A classification of predictive-reactive project scheduling procedures
- When it is worthwhile to work with the stochastic RCPSP?
- Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
- Linear preselective policies for stochastic project scheduling
- Executing production schedules in the face of uncertainties: a review and some future directions
- Algorithmic approaches to preselective strategies for stochastic scheduling problems
- Using tabu search to schedule activities of stochastic resource-constrained projects
- Chance-Constrained Programming with Joint Constraints
- A two-stage stochastic programming approach for project planning with uncertain activity durations
- A scatter search algorithm for project scheduling under partially renewable resources
- Disruption management for resource-constrained project scheduling
- A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations
- On the optimal management of project risk
- The generation of stable project plans
- A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept
Cited In (25)
- A compact reformulation of the two-stage robust resource-constrained project scheduling problem
- Resource constrained scheduling simulation model for alternative stochastic network projects.
- Operating room surgery scheduling with fuzzy surgery durations using a metaheuristic approach
- Shortening the project schedule: solving multimode chance-constrained critical chain buffer management using reinforcement learning
- A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
- Software project scheduling under activity duration uncertainty
- Time slack-based techniques for robust project scheduling subject to resource uncertainty
- When it is worthwhile to work with the stochastic RCPSP?
- A metaheuristic approach to the resource constrained project scheduling with variable activity durations and convex cost functions
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming
- Title not available (Why is that?)
- A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem
- Optimizing resource-constrained project scheduling problem considering the reliability function
- A heuristic method for RCPSP with fuzzy activity times
- Genetic tabu search for the fuzzy flexible job shop problem
- Robust execution strategies for project scheduling with unreliable resources and stochastic durations
- Proactive policies for the stochastic resource-constrained project scheduling problem
- A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints
- New strategies for stochastic resource-constrained project scheduling
- An evolutionary approach for resource constrained project scheduling with uncertain changes
- A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations
- Construction project scheduling problem with uncertain resource constraints
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem
- Surveys on resource-constrained project scheduling under uncertainty
Uses Software
This page was built for publication: A heuristic approach for resource constrained project scheduling with uncertain activity durations
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q632677)