An evolutionary approach for resource constrained project scheduling with uncertain changes
From MaRDI portal
Publication:2664456
DOI10.1016/j.cor.2020.105104zbMath1458.90380OpenAlexW3086745442MaRDI QIDQ2664456
Saber M. Elsayed, Daryl L. Essam, Forhad Zaman, Carlos A. Coello Coello, Ruhul A. Sarker
Publication date: 20 April 2021
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2020.105104
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Stochastic scheduling theory in operations research (90B36)
Related Items (5)
\(\Gamma\)-robust optimization of project scheduling problems ⋮ Hybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and production of resources ⋮ Resource-constrained multi-project scheduling problem: a survey ⋮ A hybrid genetic algorithm for scheduling jobs sharing multiple resources under uncertainty ⋮ A two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staff
Uses Software
Cites Work
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming
- A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing
- Efficient priority rules for the stochastic resource-constrained project scheduling problem
- When it is worthwhile to work with the stochastic RCPSP?
- PSPLIB -- a project scheduling problem library
- Using tabu search to schedule activities of stochastic resource-constrained projects
- New strategies for stochastic resource-constrained project scheduling
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem
- An exact composite lower bound strategy for the resource-constrained project scheduling problem
- A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem
- An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case
- An efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the resource constrained project scheduling problem
- Multi-method based algorithm for multi-objective problems under uncertainty
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints
- A hybrid genetic algorithm for the resource-constrained project scheduling problem
- A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem
- Expected Critical Path Lengths in PERT Networks
This page was built for publication: An evolutionary approach for resource constrained project scheduling with uncertain changes