A scatter search algorithm for project scheduling under partially renewable resources
From MaRDI portal
Publication:2491335
Recommendations
- GRASP and path relinking for project scheduling under partially renewable resources
- Project Scheduling Under Partially Renewable Resource Constraints
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
Cites work
- Advanced production scheduling for batch plants in process industries
- Case-based reasoning and improved adaptive search for project scheduling
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Critical-Path Planning and Scheduling: Mathematical Basis
- GRASP and path relinking for project scheduling under partially renewable resources
- GRASP: An annoted bibliography
- ProGen/\(\pi x\) -- An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions
- Project Scheduling Under Partially Renewable Resource Constraints
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Project scheduling. A research handbook.
- Scatter search
- Scheduling of continuous and discontinuous material flows with intermediate storage restrictions
- Scheduling the factory pick-up of new cars
- Scheduling the production of rolling ingots: industrial context, model, and solution method
Cited in
(20)- Branch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurement
- Scatter search for the stochastic travel-time vehicle routing problem with simultaneous pick-ups and deliveries
- A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints
- A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints
- Enriched metaheuristics for the resource constrained unrelated parallel machine scheduling problem
- Modeling and solving a bi-objective airport slot scheduling problem
- GRASP and path relinking for project scheduling under partially renewable resources
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
- Scatter search for project scheduling with resource availability cost
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- Allocation of partially renewable resources: Concept, capabilities, and applications
- Project Scheduling Under Partially Renewable Resource Constraints
- Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars
- Project scheduling with flexible resources: formulation and inequalities
- A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints
- A heuristic approach for resource constrained project scheduling with uncertain activity durations
- Generation schemes for the resource-constrained project scheduling problem with partially renewable resources and generalized precedence constraints
- A branch and cut algorithm for resource-constrained project scheduling problem subject to nonrenewable resources with pre-scheduled procurement
- Scheduling tests in automotive R\&D projects
- A survey of variants and extensions of the resource-constrained project scheduling problem
This page was built for publication: A scatter search algorithm for project scheduling under partially renewable resources
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2491335)