Case-based reasoning and improved adaptive search for project scheduling
From MaRDI portal
Recommendations
- Resource-constrained project scheduling: An evaluation of adaptive control schemes for parameterized sampling heuristics
- Adaptive search for solving hard project scheduling problems
- Case-based reasoning in scheduling: Reusing solution components
- A constraint-based perspective in resource constrained project scheduling
- Search Heuristics for Resource Constrained Project Scheduling
Cites work
- A Greedy Randomized Adaptive Search Procedure for the Two-Partition Problem
- Adaptive search for solving hard project scheduling problems
- Artificial intelligence and human decision making
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Driving tabu search with case-based reasoning
- Genetic Algorithms and Random Keys for Sequencing and Optimization
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
- scientific article; zbMATH DE number 1300399 (Why is no real title available?)
- Improving the Efficiency of Tabu Search for Machine Sequencing Problems
- New Search Spaces for Sequencing Problems with Application to Job Shop Scheduling
- On the use of the complexity index as a measure of complexity in activity networks
- Problem space search algorithms for resource-constrained project scheduling
- Project Scheduling Under Partially Renewable Resource Constraints
- PSPLIB -- a project scheduling problem library
- Scheduling of Project Networks by Job Assignment
- Search Heuristics for Resource Constrained Project Scheduling
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
- Semi-greedy heuristics: An empirical study
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
Cited in
(15)- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- Planning the project management way: Efficient planning by effective integration of causal and resource reasoning in RealPlan
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem
- Considering project management activities for engineering design groups
- A scatter search algorithm for project scheduling under partially renewable resources
- An analysis of network and resource indicators for resource-constrained project scheduling problem instances
- An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem
- Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation
- Case-based reasoning in scheduling: Reusing solution components
- An efficient multi-pass heuristic for project scheduling with constrained resources
- Resource-constrained project scheduling: An evaluation of adaptive control schemes for parameterized sampling heuristics
- scientific article; zbMATH DE number 1929250 (Why is no real title available?)
- A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem
- A neurogenetic approach for the resource-constrained project scheduling problem
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
This page was built for publication: Case-based reasoning and improved adaptive search for project scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4487088)