Modeling and solving a bi-objective airport slot scheduling problem
DOI10.1016/J.EJOR.2019.12.008zbMATH Open1441.90056OpenAlexW2996455342MaRDI QIDQ2301948FDOQ2301948
Authors: Konstantinos N. Androutsopoulos, Eleftherios Manousakis, Michael A. Madas
Publication date: 25 February 2020
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2019.12.008
Recommendations
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Project Scheduling Under Partially Renewable Resource Constraints
- An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem
- Improving the feasibility pump
- The feasibility pump
- P-Complete Approximation Problems
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- Using metaheuristics in multiobjective resource constrained project scheduling
- Multi-objective metaheuristic algorithms for the resource-constrained project scheduling problem with precedence relations
- A scatter search algorithm for project scheduling under partially renewable resources
- An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem
- Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems
- Minimizing weighted earliness-tardiness on parallel machines using hybrid metaheuristics
- An integrated scheduling and operations approach to airport congestion mitigation
- Increasing airport capacity utilisation through optimum slot scheduling: review of current developments and identification of future needs
- Allocation of partially renewable resources: Concept, capabilities, and applications
Cited In (4)
- Increasing airport capacity utilisation through optimum slot scheduling: review of current developments and identification of future needs
- The spatial dimension of competition among airports at the worldwide level: a spatial stochastic frontier analysis
- A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints
- A bi-objective approach for scheduling ground-handling vehicles in airports
Uses Software
This page was built for publication: Modeling and solving a bi-objective airport slot scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2301948)