Critical-Path Planning and Scheduling: Mathematical Basis

From MaRDI portal
Publication:3277805

DOI10.1287/opre.9.3.296zbMath0098.12103OpenAlexW2155467293MaRDI QIDQ3277805

James Kelley

Publication date: 1961

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/opre.9.3.296




Related Items

Maximizing total early work in a distributed two‐machine flow‐shopThe contractor time–cost–credit trade‐off problem: integer programming model, heuristic solution, and business insightsNew pseudo polynomial algorithms for a partial resource-constrained project scheduling problemProject scheduling problem with fuzzy activity durations: a novel operational law based solution frameworkEvaluation of the quantiles and superquantiles of the makespan in interval valued activity networksSingle-machine scheduling of multiple projects with controllable processing timesThree-parametrical harmonization model in project management by means of simulationBalancing problems in acyclic networksThe construction of stable project baseline schedulesA revised critical path method for networks including both overlap relationships and variable-duration activitiesPERT and crashing revisited: Mathematical generalizationsProject scheduling problem with mixed uncertainty of randomness and fuzzinessThe discrete time/cost trade-off problem: Extensions and heuristic proceduresScheduling project activities in a distributed environmentA network flow algorithm for just-in-time project schedulingComplexity results for the linear time-cost tradeoff problem with multiple milestones and completely ordered jobsA float-path theory and its application to the time-cost tradeoff problemMin-Max Regret Version of the Linear Time–Cost Tradeoff Problem with Multiple Milestones and Completely Ordered JobsA continuous time-cost tradeoff problem with multiple milestones and completely ordered jobsResource allocation in multi-class dynamic PERT networks with finite capacityOptimal crashing of an activity network with disruptionsA hybrid variable neighborhood search algorithm for solving the limited-buffer permutation flow shop scheduling problem with the makespan criterionAn adaptive crashing policy for stochastic time-cost tradeoff problemsOn the integration of diverging material flows into resource-constrained project schedulingMulti-objective time-cost trade-off in dynamic PERT networks using an interactive approachOn a scheduling problem in a robotized analytical systemA transportation mode selection model for a consolidation warehouse systemKnowledge integration using problem spaces: A study in resource-constrained project schedulingAllocation of partially renewable resources: Concept, capabilities, and applicationsAn intelligent interactive project management support systemThe discrete time-cost tradeoff problem revisitedMixed-integer linear programming for resource leveling problemsSolving project scheduling problem with the philosophy of fuzzy random programmingActivity nets: A guided tour through some recent developmentsMulti-resource allocation in stochastic project schedulingFinancing and reliability analysis for schedules in the project calendar planning problemThe multi-stage dynamic stochastic decision process with unknown distribution of the random utilitiesLexicographic solution of two-objective project planning problem under constrained reliability indexCPM-Cost: Ein parametrischer DekompositionsalgorithmusA linear time-cost tradeoff problem with multiple milestones under a comb graphApproximation algorithms for precedence-constrained identical machine scheduling with rejectionCriticality analysis of activity networks under interval uncertaintyModeling stochastic project time-cost trade-offs with time-dependent activity durationsA new method for constructing a minimal PERT networkScheduling two projects with controllable processing times in a single-machine environmentIntuitionistic fuzzy multi-criteria group decision making with an application to critical path selectionModeling Block Structured Project Scheduling with Resource ConstraintsBlock structured scheduling using constraint logic programmingA fuzzy time-dependent project scheduling problemA multi-objective resource allocation problem in dynamic PERT networksMinimizing task completion time with the execution set methodA heuristic procedure for solving the dynamic probabilistic project expediting problemComputing the largest H-eigenvalue of large-scale tensors generated from directed hypergraphsConstructing a stochastic critical path network given the slacks: RepresentationShortest path algorithms for functional environmentsA nearest neighbour extension to project duration forecasting with artificial intelligenceTime-cost trade-off via optimal control theory in Markov PERT networksGRASP and path relinking for project scheduling under partially renewable resourcesNew model and heuristics for safety stock placement in general acyclic supply chain networksFuzzy project scheduling problem and its hybrid intelligent algorithmThe risk element transmission theory research of multi-objective risk-time-cost trade-offOn scheduling credited projectsA multi-objective resource allocation problem in PERT networksAn application of randomized minimum cut to the project time/cost tradeoff problemUnnamed ItemNew fuzzy models for time-cost trade-off problemA scatter search algorithm for project scheduling under partially renewable resourcesRe-planning support system for make-to-order production with reserved resourcesNetwork decomposition-based benchmark results for the discrete time-cost tradeoff problemNew computational results for the discrete time/cost trade-off problem with time-switch constraintsOn project scheduling with irregular starting time costsRobust resource allocations in temporal networksPdm time cost trade-off:activities are splittable or non-splittableCritical path analysis in the network with fuzzy activity timesKapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods)The computational complexity of the criticality problems in a network with interval activity timesA review of the contribution of operational research to project managementA satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraintsA combinatorial analysis of the permutation and non-permutation flow shop scheduling problemsSolving a tropical optimization problem with application to optimal schedulingOptimization models and a GA-based algorithm for stochastic time-cost trade-off problemA critical path generalization of the additive factor method: Analysis of a stroop taskA minmax regret approach to the critical path method with task interval timesResource-constrained project scheduling: Notation, classification, models, and methodsDAGEN: A generator of testsets for project activity netsProject management with time, cost, and quality considerationsSu alcuni problemi di ordinamentoHierarchical approach to project planning: The case of a petroleum pipeline constructionNucleo di una rete PERT e problema dei ritardiUnnamed ItemJob-shop scheduling with resource-time models of operationsModels of central capacity and concurrencyThe Bi-Criterial Approach to Project Cost and Schedule Buffers SizingOn the use of genetic programming to evolve priority rules for resource constrained project scheduling problemsComputing latest starting times of activities in interval-valued networks with minimal time lagsThe resource constrained project scheduling problem with multiple crashable modes: A heuristic procedureOn the optimal management of project riskOptimization analysis for design and planning of multi-project programsA new Shapley value-based rule for distributing delay costs in stochastic projectsA parametric algorithm for convex cost network flow and related problemsA network flow procedure for project crashing with penalty nodesProject scheduling problem with stochastic activity duration timesA genetic algorithm approach for the time-cost trade-off in PERT networksFuzzy quantities in networksImproving project cost estimation by taking into account managerial flexibilityA Time–Cost Tradeoff Problem with Multiple Assessments and Release Times on a Chain Precedence Graph