The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure
From MaRDI portal
Publication:1296080
DOI10.1016/S0377-2217(97)00331-7zbMath0943.90026OpenAlexW1987091081MaRDI QIDQ1296080
Publication date: 13 September 2000
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(97)00331-7
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Related Items (5)
The construction of stable project baseline schedules ⋮ A multi-objective imperialist competitive algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations ⋮ Project scheduling with finite or infinite number of activity processing modes -- a survey ⋮ A review of the contribution of operational research to project management ⋮ PSPLIB -- a project scheduling problem library
Cites Work
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- Optimal procedures for the discrete time/cost trade-off problem in project networks
- Resource-constrained project scheduling. Exact methods for the multi-mode case
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- A Network Flow Computation for Project Cost Curves
- Critical-Path Planning and Scheduling: Mathematical Basis
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- A Horizon-Varying, Zero-One Approach to Project Scheduling
- Project scheduling: The effects of problem structure on heuristic performance
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- Optimum Time Compression in Project Scheduling
- Critical Path Problems with Concave Cost-Time Curves
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
This page was built for publication: The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure