Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
From MaRDI portal
Publication:3956727
DOI10.1287/mnsc.28.10.1197zbMath0493.90042OpenAlexW2003759470MaRDI QIDQ3956727
Publication date: 1982
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.28.10.1197
algorithmsoptimal solutionscomputational resultsheuristic solutionsminimization of project completion timeminimization of project costmultiple resource restrictionsnonpreemptive resource-constrained project schedulingresource-constrained time-cost tradeoff problem
Related Items
Meta-heuristic solution with considering setup time for multi-skilled project scheduling problem, A \(0-1\) goal programming model for scheduling multiple maintenance projects at a copper mine, A revised critical path method for networks including both overlap relationships and variable-duration activities, Hierarchical models for multi-project planning and scheduling, A tabu-search heuristic for the flexible-resource flow shop scheduling problem, Constrained multi-project planning problems: A Lagrangean decomposition approach, A local constraint based analysis approach to project scheduling under general resource constraints, Scheduling resource-constrained projects with a flexible project structure, Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining, Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project, Mass customization in videotape duplication and conversion: challenges of flexible duplication systems, fast delivery, and electronic service, Scheduling independent tasks with multiple modes, Two level heuristic for the resource constrained scheduling problem, Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting, A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem, New trends in machine scheduling, Simple heuristics for scheduling with limited intermediate storage, An exact algorithm for project scheduling with multiple modes, A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows, Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources, Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem, Project scheduling with finite or infinite number of activity processing modes -- a survey, Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic, Continuous-time formulations for multi-mode project scheduling, Time-cost trade-off analysis of project networks in fuzzy environments, Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers, An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources, Resource-constrained project scheduling: A survey of recent developments., A survey of results for sequencing problems with controllable processing times, Modeling stochastic project time-cost trade-offs with time-dependent activity durations, The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds, A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags, A list-scheduling heuristic for the short-term planning of assessment centers, A time indexed formulation of non-preemptive single machine scheduling problems, Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem, Scheduling projects with heterogeneous resources to meet time and quality objectives, Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies, An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances, A constraint-based perspective in resource constrained project scheduling, New fuzzy models for time-cost trade-off problem, A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem, Benders decomposition, Lagrangean relaxation and metaheuristic design, An experimental analysis of solution performance in a resource sharing and scheduling problem, Fuzzy approach for production planning and detailed scheduling in paints manufacturing, A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine, Kapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods), Revenue sharing for resource transfer among projects, Some efficient multi-heuristic procedures for resource-constrained project scheduling, Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems, A multi-stage non-deterministic model for project scheduling under resources constraints, Maximising the weighted number of activity execution modes in project planning, Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem, A Decomposition Algorithm for Nested Resource Allocation Problems, Um algoritmo exato para o problema de programação de projetos com custo de disponibilidade de recursos e múltiplos modos, Resource-constrained project scheduling: Notation, classification, models, and methods, The multi-mode resource-constrained project scheduling problem with generalized precedence relations, A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes, A framework for an interactive project scheduling system under limited resources, Optimal resource profiles for program scheduling, A genetic algorithm for multi-mode resource constrained project scheduling problem, On the use of the complexity index as a measure of complexity in activity networks, PSPLIB -- a project scheduling problem library, A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem, Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application, A model to optimize project resource allocation by construction of a balanced histogram, An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains, A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem, The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure, Heuristics for multimode scheduling problems with dedicated resources, Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm, Preemptive scheduling of independent jobs on parallel machines subject to financial constraints, Environmental regulation in project-based industries, Resource-constrained project scheduling by simulated annealing, The job shop tardiness problem: A decomposition approach, Resource-constrained project scheduling through the goal programming model: integration of the manager's preferences, A comparative study of computational procedures for the resource constrained project scheduling problem, Solving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms