The multi-mode resource-constrained project scheduling problem with generalized precedence relations
DOI10.1016/S0377-2217(99)00151-4zbMATH Open0934.90040OpenAlexW1978355921MaRDI QIDQ1807061FDOQ1807061
Authors: Bert De Reyck, Willy Herroelen
Publication date: 8 November 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(99)00151-4
Recommendations
- A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
- Resource-constrained project scheduling: A heuristic for the multi-mode case
- scientific article; zbMATH DE number 4121742
- A genetic algorithm for multi-mode resource constrained project scheduling problem
- Resource-constrained project scheduling. Exact methods for the multi-mode case
heuristicsplanninglocal searchschedulingtabu searchproject managementgeneralizing precedence relationsmultiple activity modes
Cites Work
- On the measurement of complexity in activity networks
- Title not available (Why is that?)
- An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Title not available (Why is that?)
- Resource-constrained project scheduling: A survey of recent developments.
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations
- Title not available (Why is that?)
- Title not available (Why is that?)
- Local search methods for the discrete time/resource trade-off problem in project networks
- The Analysis of Activity Networks Under Generalized Precedence Relations (GPRs)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
- Resource-constrained project scheduling. Exact methods for the multi-mode case
- DSS for multiobjective project scheduling
- Hierarchical models for multi-project planning and scheduling
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Bandwidth Packing: A Tabu Search Approach
- Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production
- A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- An exact algorithm for project scheduling with multiple modes
- Project scheduling with multiple modes: A comparison of exact algorithms
- A local constraint based analysis approach to project scheduling under general resource constraints
- Resource-constrained project scheduling by simulated annealing
- Title not available (Why is that?)
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations
- Heuristics for scheduling resource-constrained projects in MPM networks
Cited In (31)
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- A robust multi-project scheduling problem under a resource dedication-transfer policy
- A Branch-and-Bound method for solving Multi-Skill Project Scheduling Problem
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags
- Considering project management activities for engineering design groups
- A survey of variants and extensions of the resource-constrained project scheduling problem
- On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations
- Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective
- Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations
- Activity couple with interdependent durations: serial, parallel or partly overlapping scheduling?
- Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres
- Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm
- Lower bounds for resource-constrained project scheduling problems.
- A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
- Skilled workforce scheduling in service centres
- Production scheduling with alternative process plans
- Price of anarchy and price of stability in multi-agent project scheduling
- Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting
- Resource-constrained project scheduling: Notation, classification, models, and methods
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations
- Reactive scheduling in the multi-mode RCPSP
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources
- Modelling and solving generalised operational surgery scheduling problems
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
- A satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraints
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
- A double genetic algorithm for the MRCPSP/max
- Project selection, scheduling and resource allocation with time dependent returns
- An improved MIP-based approach for a multi-skill workforce scheduling problem
- A learning-based optimization approach to multi-project scheduling
Uses Software
This page was built for publication: The multi-mode resource-constrained project scheduling problem with generalized precedence relations