A genetic algorithm for multi-mode resource constrained project scheduling problem
From MaRDI portal
Publication:1278080
DOI10.1016/S0377-2217(96)00180-4zbMath0947.90589MaRDI QIDQ1278080
Publication date: 22 April 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Related Items (22)
A polarized adaptive schedule generation scheme for the resource-constrained project scheduling problem ⋮ A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource ⋮ Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project ⋮ Project scheduling with finite or infinite number of activity processing modes -- a survey ⋮ Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic ⋮ Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem ⋮ Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers ⋮ A hybrid metaheuristic for the resource-constrained project scheduling problem ⋮ Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm ⋮ An introduction of dominant genes in genetic algorithm for FMS ⋮ A dynamic intelligent decision approach to dependency modeling of project tasks in complex engineering system optimization ⋮ A review of some issues and identification of some barriers in the implementation of FMS ⋮ An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances ⋮ An evolutionary approach to rehabilitation patient scheduling: A case study ⋮ Scheduling and constraint propagation ⋮ A high-performance exact method for the resource-constrained project scheduling problem ⋮ A robust optimization approach for the multi-mode resource-constrained project scheduling problem ⋮ A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem ⋮ A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem ⋮ An equitable approach to the payment scheduling problem in project management ⋮ Evolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-art ⋮ Solving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms
Cites Work
- Unnamed Item
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- A multi-stage non-deterministic model for project scheduling under resources constraints
- A genetic algorithm for flowshop sequencing
- A genetic algorithm for the job shop problem
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- A Random Activity Network Generator
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
This page was built for publication: A genetic algorithm for multi-mode resource constrained project scheduling problem