Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
From MaRDI portal
(Redirected from Publication:721682)
Recommendations
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- scientific article; zbMATH DE number 1264426
- A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem
- An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
- scientific article; zbMATH DE number 4135692
Cites work
- scientific article; zbMATH DE number 4095196 (Why is no real title available?)
- scientific article; zbMATH DE number 3599820 (Why is no real title available?)
- A Dynamic Programming Algorithm for Decision CPM Networks
- A Horizon-Varying, Zero-One Approach to Project Scheduling
- Algorithm 520: An Automatic Revised Simplex Method for Constrained Resource Network Scheduling [H]
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
- ON CERTAIN MODELS OF RESOURCE ALLOCATION PROBLEMS
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
- Two Approaches to Problems of Resource Allocation among Project Activities -- A Comparative Study
Cited in
(37)- Constrained multi-project planning problems: A Lagrangean decomposition approach
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
- A framework for an interactive project scheduling system under limited resources
- Activity list representation for a generalization of the resource-constrained project scheduling problem
- A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
- Hierarchical models for multi-project planning and scheduling
- Project network models with discounted cash flows a guided tour through recent developments
- A genetic algorithm for multi-mode resource constrained project scheduling problem
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Progress payments in project scheduling problems.
- Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application
- PSPLIB -- a project scheduling problem library
- A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows
- Resource-constrained project scheduling: Notation, classification, models, and methods
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure
- Interactive analysis of multiple-criteria project scheduling problems
- Resource-constrained project scheduling by simulated annealing
- Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach
- A local constraint based analysis approach to project scheduling under general resource constraints
- An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case
- Scheduling a project to maximize its net present value: An integer programming approach
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations
- DSS for multiobjective project scheduling
- Solving the resource constrained project scheduling problem with optimization subroutine library
- Simulated annealing and tabu search for multi-mode project payment scheduling
- A comparison of stochastic scheduling rules for maximizing project net present value
- A model to optimize project resource allocation by construction of a balanced histogram
- Bicriteria train scheduling for high-speed passenger railroad planning applications
- A constraint-based perspective in resource constrained project scheduling
- On the generation of circuits and minimal forbidden sets
- Resource-constrained project scheduling: A survey of recent developments.
- Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
This page was built for publication: Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q721682)