Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach
From MaRDI portal
Publication:2366088
DOI10.1016/0377-2217(93)90184-OzbMath0769.90051MaRDI QIDQ2366088
Rema Padman, Dwight E. Smith-Daniels
Publication date: 29 June 1993
Published in: European Journal of Operational Research (Search for Journal in Brave)
heuristicsplanningresource constrained project schedulinggreedy heuristicstardiness penaltiesearliness costs
Deterministic scheduling theory in operations research (90B35) Deterministic network models in operations research (90B10) Resource and cost allocation (including fair division, apportionment, etc.) (91B32) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Related Items
Unnamed Item, A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows, Solving the resource constrained project scheduling problem with optimization subroutine library, A comparison of stochastic scheduling rules for maximizing project net present value, Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models, Client‐contractor bargaining on net present value in project scheduling with limited resources, Progress payments in project scheduling problems., A framework for an interactive project scheduling system under limited resources, Project network models with discounted cash flows a guided tour through recent developments, An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment, Simulated annealing and tabu search for multi-mode project payment scheduling
Cites Work
- Unnamed Item
- The scheduling of activities to maximize the net present value of projects
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- A multi-stage non-deterministic model for project scheduling under resources constraints
- Optimal resource profiles for program scheduling
- Manufacturing systems with forbidden early order departure
- Dual Algorithms for Pure Network Problems
- Multi-Project Scheduling: Categorization of Heuristic Rules Performance
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
- Heuristic scheduling of resource-constrained projects with cash flows
- Cash Flows in Networks
- The payment scheduling problem