Multi-Project Scheduling: Categorization of Heuristic Rules Performance
From MaRDI portal
Publication:3944337
DOI10.1287/MNSC.28.2.161zbMATH Open0484.90063OpenAlexW2068616350MaRDI QIDQ3944337FDOQ3944337
Authors:
Publication date: 1982
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.28.2.161
Cited In (41)
- A comparative study of computational procedures for the resource constrained project scheduling problem
- A random generator of resource-constrained multi-project network problems
- Multi-project scheduling with two-stage decomposition
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty
- Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
- Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns
- Solving a real-life multi-skill resource-constrained multi-project scheduling problem
- The performance of priority rules for the dynamic stochastic resource-constrained multi-project scheduling problem: an experimental investigation
- Heuristic methods and applications: A categorized survey
- An intelligent interactive project management support system
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
- Tabu search in audit scheduling
- Revenue sharing for resource transfer among projects
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Knowledge integration using problem spaces: A study in resource-constrained project scheduling
- Resource allocation in multi-class dynamic PERT networks with finite capacity
- Resource allocation in dynamic PERT networks with finite capacity
- A comparison of stochastic scheduling rules for maximizing project net present value
- Constrained multi-project planning problems: A Lagrangean decomposition approach
- A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling
- A genetic algorithm for the resource constrained multi-project scheduling problem
- Resource allocation in stochastic, finite-capacity, multi-project systems through the cross entropy methodology
- Resource-constrained multi-project scheduling problem: a survey
- New summary measures and datasets for the multi-project scheduling problem
- Two level heuristic for the resource constrained scheduling problem
- Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application
- A \(0-1\) goal programming model for scheduling multiple maintenance projects at a copper mine
- Managing and modelling general resource transfers in (multi-)project scheduling
- A multicriteria heuristic method to improve resource allocation in multiproject scheduling
- A multi-project management framework for new product development
- Investigating a claim about resource complexity measure
- A decomposition approach to multi-project scheduling
- An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment
- Hierarchical models for multi-project planning and scheduling
- Kapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods)
- A learning-based optimization approach to multi-project scheduling
- Resource-constrained project scheduling by simulated annealing
- Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach
This page was built for publication: Multi-Project Scheduling: Categorization of Heuristic Rules Performance
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3944337)