Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application
From MaRDI portal
Publication:1291582
DOI10.1016/S0377-2217(96)00219-6zbMath0948.90060OpenAlexW2039397685MaRDI QIDQ1291582
Frank Salewski, Andreas Schirmer, Andreas Drexl
Publication date: 21 November 2000
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(96)00219-6
project schedulingproject managementprecedence constraintstemporal constraintsresource constraintsaudit-staff schedulingmode identity constraintsregret-based biased random sampling
Related Items (16)
Scheduling resource-constrained projects with a flexible project structure ⋮ A multi-objective imperialist competitive algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations ⋮ Project scheduling with finite or infinite number of activity processing modes -- a survey ⋮ Local search approaches for the test laboratory scheduling problem with variable task grouping ⋮ Optimal workforce assignment to operations of a paced assembly line ⋮ Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers ⋮ Production scheduling with alternative process plans ⋮ A list-scheduling heuristic for the short-term planning of assessment centers ⋮ A local search framework for industrial test laboratory scheduling ⋮ Scheduling projects with heterogeneous resources to meet time and quality objectives ⋮ Re-planning support system for make-to-order production with reserved resources ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Maximising the weighted number of activity execution modes in project planning ⋮ Resource-constrained project scheduling: Notation, classification, models, and methods ⋮ ProGen/\(\pi x\) -- An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions ⋮ Improving project cost estimation by taking into account managerial flexibility
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- An introduction to timetabling
- Resource-constrained project scheduling. Exact methods for the multi-mode case
- Scheduling of Project Networks by Job Assignment
- Multi-Project Scheduling: Categorization of Heuristic Rules Performance
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
- Complexity Results for Multiprocessor Scheduling under Resource Constraints
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project Scheduling
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
This page was built for publication: Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application