Local search approaches for the test laboratory scheduling problem with variable task grouping
DOI10.1007/S10951-021-00699-2zbMATH Open1527.90106OpenAlexW3200300706MaRDI QIDQ6090219FDOQ6090219
Authors: Florian Mischek, Nysret Musliu, Andrea Schaerf
Publication date: 14 November 2023
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-021-00699-2
Recommendations
- A local search framework for industrial test laboratory scheduling
- scientific article; zbMATH DE number 4091174
- Local Search in Complex Scheduling Problems
- Coupling Stochastic and Deterministic Local Search in Examination Timetabling
- Local search and constraint programming for a real-world examination timetabling problem
- Local search methods for the flowshop scheduling problem with flowtime minimization
- A Computational Study of Local Search Algorithms for Job Shop Scheduling
- A variable neighborhood MOEA/D for multiobjective test task scheduling problem
- Efficient local search algorithms for job-shop scheduling problems
- A comparison of local search methods for flow shop scheduling
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Optimization by simulated annealing
- Title not available (Why is that?)
- Scheduling with batching: A review
- A genetic algorithm for the resource constrained multi-project scheduling problem
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Batch scheduling in process industries: An application of resource-constrained project scheduling
- Modelling setup times in project scheduling
- Title not available (Why is that?)
- A simulated annealing hyper-heuristic methodology for flexible decision support
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application
- Multi-resource shop scheduling with resource flexibility
- ProGen/\(\pi x\) -- An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions
- The multi-mode resource-constrained multi-project scheduling problem, The MISTA 2013 challenge
- Minimizing conflicts: A heuristic repair method for constraint satisfaction and scheduling problems
- Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
- Scheduling tests in automotive R\&D projects
- A local search framework for industrial test laboratory scheduling
- A choice function hyper-heuristic framework for the allocation of maintenance tasks in Danish railways
- Investigating constraint programming for real world industrial test laboratory scheduling
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
Cited In (1)
This page was built for publication: Local search approaches for the test laboratory scheduling problem with variable task grouping
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6090219)