Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
From MaRDI portal
Publication:4091698
DOI10.1287/MNSC.22.11.1186zbMATH Open0326.90029OpenAlexW2083153428MaRDI QIDQ4091698FDOQ4091698
Authors: Dale F. Cooper
Publication date: 1976
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.22.11.1186
Numerical mathematical programming methods (65K05) Deterministic scheduling theory in operations research (90B35)
Cited In (28)
- Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects
- A comparative study of computational procedures for the resource constrained project scheduling problem
- On the summary measures for the resource-constrained project scheduling problem
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
- Case-based reasoning and improved adaptive search for project scheduling
- Heuristics for scheduling resource-constrained projects in MPM networks
- On the measurement of complexity in activity networks
- Heuristic methods and applications: A categorized survey
- New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms
- An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Resource-constrained project scheduling: A survey of recent developments.
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- Evaluating project completion time in project networks with discrete random activity durations
- On the use of the complexity index as a measure of complexity in activity networks
- Efficient priority rules for the stochastic resource-constrained project scheduling problem
- New concepts for activity float in resource-constrained project management
- A random key based genetic algorithm for the resource constrained project scheduling problem
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application
- A multicriteria heuristic method to improve resource allocation in multiproject scheduling
- A neurogenetic approach for the resource-constrained project scheduling problem
- A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem
- A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem
- Resource leveling in projects with flexible structures
- Robust surgery loading
- Resource-constrained project scheduling by simulated annealing
This page was built for publication: Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4091698)