New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms
From MaRDI portal
Recommendations
- An analysis of network and resource indicators for resource-constrained project scheduling problem instances
- Going to the core of hard resource-constrained project scheduling instances
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- New summary measures and datasets for the multi-project scheduling problem
Cites work
- A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints
- A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
- A survey of variants and extensions of the resource-constrained project scheduling problem
- An analysis of network and resource indicators for resource-constrained project scheduling problem instances
- An evaluation of the adequacy of project network generators with systematically sampled networks
- An exact composite lower bound strategy for the resource-constrained project scheduling problem
- An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques
- An iterative scheduling technique for resource-constrained project scheduling
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Going to the core of hard resource-constrained project scheduling instances
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
- Metaheuristics ``In the large
- On maximizing the net present value of a project under renewable resource constraints
- Phase transitions in project scheduling
- Project scheduling: The effects of problem structure on heuristic performance
- PSPLIB -- a project scheduling problem library
- Testing heuristics: We have it all wrong
Cited in
(9)- Reducing the feasible solution space of resource-constrained project instances
- An adapted constraint-programming formulation of the resource-constrained project scheduling problem applied to the identical parallel machines group shop and mixed shop scheduling problems
- Comparing and extending satisfiability solution methods for the resource-constrained project scheduling problem
- Fifty years of research on resource-constrained project scheduling explored from different perspectives
- A novel metaheuristic algorithm with applications in parameter estimation and engineering problems
- Surrogate-assisted cooperative learning genetic programming for the resource-constrained project scheduling problem with stochastic activity durations and transfer times
- Duration forecasting in resource constrained projects: a hybrid risk model combining complexity indicators with sensitivity measures
- A matheuristic for the resource-constrained project scheduling problem
- Multi-project scheduling and material ordering with time varying supplier capacities