James H. Patterson, F. Brian Talbot
Publication date: 1978
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.24.11.1163
An exact algorithm for an integrated project staffing problem with a homogeneous workforce ⋮
Scheduling a project to maximize its net present value: An integer programming approach ⋮
Hierarchical models for multi-project planning and scheduling ⋮
MIPS: A DSS for multiobjective interactive project scheduling ⋮
A local constraint based analysis approach to project scheduling under general resource constraints ⋮
Allocating slacks in stochastic PERT network ⋮
Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars ⋮
A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints ⋮
Two level heuristic for the resource constrained scheduling problem ⋮
An exact composite lower bound strategy for the resource-constrained project scheduling problem ⋮
Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production ⋮
Project scheduling and equipment planning with random breakdowns ⋮
A comparison of stochastic scheduling rules for maximizing project net present value ⋮
Allocation of partially renewable resources: Concept, capabilities, and applications ⋮
Resource-constrained job scheduling with recyclable resources ⋮
Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem ⋮
Activity nets: A guided tour through some recent developments ⋮
Integrated time–cost tradeoff and resources leveling problems with allowed activity splitting ⋮
A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints ⋮
A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem ⋮
A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints ⋮
Resource-constrained project scheduling: A survey of recent developments. ⋮
Multiobjective network scheduling with efficient use of renewable and nonrenewable resources ⋮
Scheduling of project networks ⋮
Algorithms for electric vehicle scheduling in large-scale mobility-on-demand schemes ⋮
New representation to reduce the search space for the resource-constrained project scheduling problem ⋮
Considering project management activities for engineering design groups ⋮
A constraint-based perspective in resource constrained project scheduling ⋮
A neurogenetic approach for the resource-constrained project scheduling problem ⋮
Fuzzy approach for production planning and detailed scheduling in paints manufacturing ⋮
Kapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods) ⋮
Some efficient multi-heuristic procedures for resource-constrained project scheduling ⋮
Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems ⋮
A high-performance exact method for the resource-constrained project scheduling problem ⋮
Resource-constrained project scheduling: Notation, classification, models, and methods ⋮
Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling ⋮
Modeling and solving a bi-objective airport slot scheduling problem ⋮
Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation ⋮
A framework for an interactive project scheduling system under limited resources ⋮
A multiple-tree search procedure for the resource-constrained project scheduling problem ⋮
Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer ⋮
Project network models with discounted cash flows a guided tour through recent developments ⋮
An interactive decision support system for the resource constrained scheduling problem ⋮
Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application ⋮
The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure ⋮
Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm ⋮
Optimal control policies for resource allocation in an activity network ⋮
Review of properties of different precedence graphs for scheduling problems ⋮
Scheduling Models: Shibboleth and Operating Characteristics ⋮
Resource-constrained project scheduling by simulated annealing ⋮
Resource-constrained project scheduling through the goal programming model: integration of the manager's preferences ⋮
Resource constrained project scheduling: Modelling with multiple alternatives ⋮
A comparative study of computational procedures for the resource constrained project scheduling problem ⋮
Complexity of the scheduling language RSV
This page was built for publication: An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems