Allocating slacks in stochastic PERT network
From MaRDI portal
Recommendations
- A rule for slack allocation proportional to the duration in a PERT network
- Iterative converging algorithms for computing bounds on durations of activities in pert and pert-like models
- A project game for PERT networks
- A New Approach to the Activity-time Distribution in PERT
- scientific article; zbMATH DE number 5138849
Cites work
- A genetic algorithm approach for the time-cost trade-off in PERT networks
- A new probabilistic approach to the path criticality in stochastic PERT
- A polynomial rule for the problem of sharing delay costs in PERT networks
- A rule for slack allocation proportional to the duration in a PERT network
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- Bounding the Project Completion Time Distribution in PERT Networks
- Computing bounds on project duration distributions for stochastic PERT networks
- Iterative converging algorithms for computing bounds on durations of activities in pert and pert-like models
- NTU PERT games
- The equal award principle in problems with constraints and claims
- The proportional rule for problems with constraints and claims.
- Two approaches to the problem of sharing delay costs in joint projects
Cited in
(6)- Or in the industrial engineering of industry 4.0: experiences from the Iberian Peninsula mirrored in CJOR
- Scheduling Markovian PERT networks to maximize the net present value
- Sharing delay costs in stochastic scheduling problems with delays
- A project game for PERT networks
- Revenue sharing for resource reallocation among project activity contractors
- A rule for slack allocation proportional to the duration in a PERT network
This page was built for publication: Allocating slacks in stochastic PERT network