A New Approach to the Activity-time Distribution in PERT
From MaRDI portal
Recommendations
Cited in
(36)- A classified bibliography of recent research relating to project risk management
- A proposal on improved procedures for estimating task-time distributions in PERT
- Iterative converging algorithms for computing bounds on durations of activities in pert and pert-like models
- Fuzzy-probabilistic PERT
- How adding new information modifies the estimation of the mean and the variance in PERT: a maximum entropy distribution approach
- Finding the distribution density of the time taken to fulfill the GERT network on the basis of equivalent simplifying transformations
- Stochastic gradient-based time-cost tradeoffs in PERT networks using simulation
- A new structural mechanism for reducibility of stochastic PERT networks
- Analysis of the stable laws of distribution of the duration of operations in the stochastic network projects
- Adjustment of the moments of the project completion times when activity times are exponentially distributed
- Proposal of a new distribution in PERT methodology
- A new approximation algorithm for obtaining the probability distribution function for project completion time
- A rule for slack allocation proportional to the duration in a PERT network
- Mixture densities for project management activity times: A robust approach to PERT
- A representation model for the solving-time distribution of a set of design tasks in new product development (NPD)
- Preprocessing stochastic shortest-path problems with application to PERT activity networks
- Allocating slacks in stochastic PERT network
- COMPLETION TIMES IN NETWORKS—THE THEORY OF RELATIVELY CLOSED SYSTEMS APPLIED TO MAXIMUM OPERATORS
- Defining distribution functions of time for basic and extended Clark's flow for activities in PERT networks
- scientific article; zbMATH DE number 1808551 (Why is no real title available?)
- 2004 Summer Meeting of the Association for Symbolic Logic
- A practical and accurate alternative to PERT
- Efficient sensitivity analysis of PERT network performance measures to significant changes in activity time parameters
- scientific article; zbMATH DE number 5759442 (Why is no real title available?)
- The distribution of time for Clarck's flow and risk assessment for the activities of PERT network structure
- A Multivariate Approach to Estimating the Completion Time for PERT Networks
- An approach to pert: application of dirichlet distribution
- On the Distribution of Activity Time in PERT
- A Classified Bibliography Of Research On Stochastic Pert Networks: 1966-1987
- A Simple Approximation to the Completion Time Distribution for a PERT Network
- Markov and Markov-Regenerative <scp>pert</scp> Networks
- Evaluating the project completion time when activity networks follow beta distribution
- scientific article; zbMATH DE number 4185362 (Why is no real title available?)
- The generalized two-sided beta distribution with applications in project risk analysis
- Evaluating project completion times when activity times are Weibull distributed
- An adaptive parallel algorithm for analyzing activity networks
This page was built for publication: A New Approach to the Activity-time Distribution in PERT