Markov and Markov-Regenerative <scp>pert</scp> Networks
DOI10.1287/OPRE.34.5.769zbMATH Open0615.90042OpenAlexW2082060556MaRDI QIDQ4724399FDOQ4724399
Authors: Vidyadhar G. Kulkarni, Veena Adlakha
Publication date: 1986
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.34.5.769
Recommendations
- Computing project makespan distributions: Markovian PERT networks revisited
- Markov skeleton process in PERT networks
- Computing bounds on project duration distributions for stochastic PERT networks
- Project completion time in dynamic PERT networks with generating projects
- A New Approach to the Activity-time Distribution in PERT
performance measuresstable algorithmsPERT networksproject completion timefinite-state, absorbing, continuous-time Markov chainsindependent and exponentially distributed activity durationsresource- constrained
Deterministic scheduling theory in operations research (90B35) Stochastic network models in operations research (90B15)
Cited In (67)
- Defining distribution functions of time for basic and extended Clark's flow for activities in PERT networks
- Analysis of the impact of corrective actions for stochastic project networks
- Project completion time in dynamic PERT networks with generating projects
- Robust scheduling in a two-machine re-entrant flow shop to minimise the value-at-risk of the makespan: branch-and-bound and heuristic algorithms based on Markovian activity networks and phase-type distributions
- GERT models in an educational institution
- Due-date assignment for multi-server multi-stage assembly systems
- COMPLETION TIMES IN NETWORKS—THE THEORY OF RELATIVELY CLOSED SYSTEMS APPLIED TO MAXIMUM OPERATORS
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- The distribution of time for Clarck's flow and risk assessment for the activities of PERT network structure
- Evaluating the project completion time when activity networks follow beta distribution
- A multi-objective lead time control problem in multistage assembly systems using an interactive method
- Project planning with alternative technologies in uncertain environments
- Lower bound for the mean project completion time in dynamic PERT networks
- Game-theoretic modeling of the project management contract
- Evaluating project completion times when activity times are Weibull distributed
- A Laplace transform method for order statistics from nonidentical random variables and its application in phase-type distribution
- Extended dominance and a stochastic shortest path problem
- Mixture densities for project management activity times: A robust approach to PERT
- Longest path analysis in networks of queues: dynamic scheduling problems
- Markov skeleton process in PERT networks
- Determination of early warning time window for bottleneck resource buffer
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure
- Stochastic networks as models of cognition: Deriving predictions for resource-constrained mental processing
- A Classified Bibliography Of Research On Stochastic Pert Networks: 1966-1987
- Project scheduling under the threat of catastrophic disruption
- A new probabilistic approach to the path criticality in stochastic PERT
- Computing project makespan distributions: Markovian PERT networks revisited
- Resource allocation in multi-class dynamic PERT networks with finite capacity
- Erlang distributed activity times in stochastic activity networks.
- Improving electromagnetism algorithm for solving resource allocation problem in stochastic networks
- Scheduling Markovian PERT networks to maximize the net present value
- Resource allocation in dynamic PERT networks with finite capacity
- Scheduling projects with stochastic activity duration to maximize expected net present value
- A classified bibliography of recent research relating to project risk management
- A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms
- Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach
- Finding the distribution density of the time taken to fulfill the GERT network on the basis of equivalent simplifying transformations
- Risk taking in stochastic PERT networks
- Scheduling modular projects on a bottleneck resource
- Evolutionary algorithms for multi-objective stochastic resource availability cost problem
- Due date assignment for multistage assembly systems
- Computing the probability distribution of project duration in a PERT network
- Multiobjective routing of hazardous materials in stochastic networks
- Markovian analysis for performance evaluation and scheduling in \(m\) machine stochastic flow-shop with buffers of any capacity
- The risk element transmission theory research of multi-objective risk-time-cost trade-off
- Maximizing the net present value of a project under uncertainty
- EOR project networks
- Modelling complex assemblies as a queueing network for lead time control
- A new structural mechanism for reducibility of stochastic PERT networks
- Scheduling Markovian PERT networks to maximize the net present value: new results
- Application of a technique for research and development program evaluation
- A surrogate indicator of criticality for stochastic project networks
- The preemptive stochastic resource-constrained project scheduling problem
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints
- An influence matrix for project expediting
- New strategies for stochastic resource-constrained project scheduling
- Estimating the mean completion time of PERT networks with exponentially distributed durations of activities
- Title not available (Why is that?)
- On criticality and sensitivity in activity networks
- A new approximation algorithm for obtaining the probability distribution function for project completion time
- A genetic algorithm approach for the time-cost trade-off in PERT networks
- A multi-objective resource allocation problem in dynamic PERT networks
- Time-cost trade-off via optimal control theory in Markov PERT networks
- A multi-objective resource allocation problem in PERT networks
- Stochastic activity networks with truncated exponential activity times
This page was built for publication: Markov and Markov-Regenerative <scp>pert</scp> Networks
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4724399)