Markov and Markov-Regenerative <scp>pert</scp> Networks

From MaRDI portal
Publication:4724399

DOI10.1287/opre.34.5.769zbMath0615.90042OpenAlexW2082060556MaRDI QIDQ4724399

Vidyadhar G. Kulkarni, Veena G. Adlakha

Publication date: 1986

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/opre.34.5.769



Related Items

A surrogate indicator of criticality for stochastic project networks, New strategies for stochastic resource-constrained project scheduling, Risk taking in stochastic PERT networks, Multiobjective routing of hazardous materials in stochastic networks, Markovian analysis for performance evaluation and scheduling in \(m\) machine stochastic flow-shop with buffers of any capacity, Project planning with alternative technologies in uncertain environments, Computing project makespan distributions: Markovian PERT networks revisited, Resource allocation in multi-class dynamic PERT networks with finite capacity, Longest path analysis in networks of queues: dynamic scheduling problems, Modelling complex assemblies as a queueing network for lead time control, Improving electromagnetism algorithm for solving resource allocation problem in stochastic networks, A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms, Evolutionary algorithms for multi-objective stochastic resource availability cost problem, Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach, A classified bibliography of recent research relating to project risk management, Scheduling Markovian PERT networks to maximize the net present value: new results, Scheduling modular projects on a bottleneck resource, Project scheduling under the threat of catastrophic disruption, Resource allocation in dynamic PERT networks with finite capacity, A new probabilistic approach to the path criticality in stochastic PERT, Game-theoretic modeling of the project management contract, The preemptive stochastic resource-constrained project scheduling problem, Stochastic networks as models of cognition: Deriving predictions for resource-constrained mental processing, A new approximation algorithm for obtaining the probability distribution function for project completion time, Lower bound for the mean project completion time in dynamic PERT networks, A multi-objective resource allocation problem in dynamic PERT networks, Determination of early warning time window for bottleneck resource buffer, Mixture densities for project management activity times: A robust approach to PERT, Extended dominance and a stochastic shortest path problem, Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure, Evaluating the project completion time when activity networks follow beta distribution, Time-cost trade-off via optimal control theory in Markov PERT networks, The risk element transmission theory research of multi-objective risk-time-cost trade-off, A multi-objective resource allocation problem in PERT networks, Evaluating project completion times when activity times are Weibull distributed, A Laplace transform method for order statistics from nonidentical random variables and its application in phase-type distribution, Scheduling Markovian PERT networks to maximize the net present value, A multi-objective lead time control problem in multistage assembly systems using an interactive method, Due date assignment for multistage assembly systems, Unnamed Item, Maximizing the net present value of a project under uncertainty, Scheduling projects with stochastic activity duration to maximize expected net present value, A genetic algorithm approach for the time-cost trade-off in PERT networks, Due-date assignment for multi-server multi-stage assembly systems, On criticality and sensitivity in activity networks, Estimating the mean completion time of PERT networks with exponentially distributed durations of activities, A new structural mechanism for reducibility of stochastic PERT networks, Stochastic activity networks with truncated exponential activity times, Minimizing the expected makespan of a project with stochastic activity durations under resource constraints