A new probabilistic approach to the path criticality in stochastic PERT
From MaRDI portal
Publication:441034
DOI10.1007/s10100-010-0151-xzbMath1245.90037OpenAlexW2004500418MaRDI QIDQ441034
Publication date: 20 August 2012
Published in: CEJOR. Central European Journal of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10100-010-0151-x
Inequalities; stochastic orderings (60E15) Stochastic scheduling theory in operations research (90B36)
Related Items (4)
Stochastic analysis of maintenance process costs in the IT industry: a case study ⋮ Allocating slacks in stochastic PERT network ⋮ The multivariate Markov and multiple Chebyshev inequalities ⋮ The evaluation of bivariate normal probabilities for failure of parallel systems
Cites Work
- Bicriteria shortest path in networks of queues
- A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network
- On criticality and sensitivity in activity networks
- The Integral of a Symmetric Unimodal Function over a Symmetric Convex Set and Some Probability Inequalities
- On the application of concentration function to the pert
- Bounding the Project Completion Time Distribution in PERT Networks
- The Completion Time of PERT Networks
- Criticality in Stochastic Networks
- Computing bounds on project duration distributions for stochastic PERT networks
- Markov and Markov-Regenerative <scp>pert</scp> Networks
- Bounds on Expected Project Tardiness
- Application of a Technique for Research and Development Program Evaluation
- Critical Path Analyses Via Chance Constrained and Stochastic Programming
- Distribution of the Time Through a Directed, Acyclic Network
- Some Concepts of Dependence
- A REDUCTION FORMULA FOR NORMAL MULTIVARIATE INTEGRALS
- The exact overall time distribution of a project with uncertain task durations
This page was built for publication: A new probabilistic approach to the path criticality in stochastic PERT