Application of a Technique for Research and Development Program Evaluation
From MaRDI portal
Publication:4903793
DOI10.1287/opre.7.5.646zbMath1255.90070OpenAlexW2077913849WikidataQ54271973 ScholiaQ54271973MaRDI QIDQ4903793
Donald G. Malcolm, W. Fazar, Charles E. Clark, J. H. Roseboom
Publication date: 26 January 2013
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.7.5.646
Related Items
Resource-constrained multi-project scheduling problem: a survey ⋮ The generalized two-sided beta distribution with applications in project risk analysis ⋮ Some analytic features of algebraic data ⋮ New strategies for stochastic resource-constrained project scheduling ⋮ The construction of stable project baseline schedules ⋮ Some results on non-central beta distributions ⋮ Risk taking in stochastic PERT networks ⋮ Distributionally robust mixed integer linear programs: persistency models with applications ⋮ Statistical dependence through common risk factors: With applications in uncertainty analysis ⋮ The most critical path in a PERT network: A heuristic approach ⋮ Computing project makespan distributions: Markovian PERT networks revisited ⋮ Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming ⋮ What if we increase the number of objectives? Theoretical and empirical implications for many-objective combinatorial optimization ⋮ Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project ⋮ Optimal crashing of an activity network with disruptions ⋮ The generalized two-sided power distribution ⋮ A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept ⋮ Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting ⋮ Sample-path optimization of convex stochastic performance functions ⋮ THE GENERALIZED BIPARABOLIC DISTRIBUTION ⋮ Algebraic methods applied to shortest path and maximum flow problems in stochastic networks ⋮ The distributionally robust machine scheduling problem with job selection and sequence-dependent setup times ⋮ A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network ⋮ A proposal on improved procedures for estimating task-time distributions in PERT ⋮ A Note on Bounds for the Moments of a Stochastic Project Planniag Model Duration ⋮ An alternative for robust estimation in project management ⋮ Stochastic activity networks: a four-parameter approach for completion times ⋮ Fuzzy-probabilistic PERT ⋮ On the conditional noncentral beta distribution ⋮ Project scheduling with finite or infinite number of activity processing modes -- a survey ⋮ Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework ⋮ The use of fuzzy variables in PERT ⋮ Least possible time paths in stochastic, time-varying networks. ⋮ Proposal of a new distribution in PERT methodology ⋮ Criticality analysis of activity networks under interval uncertainty ⋮ A new probabilistic approach to the path criticality in stochastic PERT ⋮ Computing the moments of order statistics from independent nonidentically distributed beta random variables ⋮ How to apply penalties to avoid delays in projects ⋮ Predetermined intervals for start times of activities in the stochastic project scheduling problem ⋮ How adding new information modifies the estimation of the mean and the variance in PERT: a maximum entropy distribution approach ⋮ Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology ⋮ A new approximation algorithm for obtaining the probability distribution function for project completion time ⋮ Lower bound for the mean project completion time in dynamic PERT networks ⋮ Analysis of dependent data aggregated into intervals ⋮ Minimizing task completion time with the execution set method ⋮ A heuristic procedure for solving the dynamic probabilistic project expediting problem ⋮ Multi-factor dependence modelling with specified marginals and structured association in large-scale project risk assessment ⋮ Mixture densities for project management activity times: A robust approach to PERT ⋮ Hybrid Bellman-Ford-Dijkstra algorithm ⋮ Constructing a stochastic critical path network given the slacks: Representation ⋮ An approximate dynamic programming approach to project scheduling with uncertain resource availabilities ⋮ Moments and distribution of the net present value of a serial project ⋮ Evaluating the project completion time when activity networks follow beta distribution ⋮ Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies ⋮ Reihenfolgeprobleme und Graphentheorie ⋮ The exact overall time distribution of a project with uncertain task durations ⋮ Revisiting the PERT mean and variance ⋮ Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology ⋮ New model and heuristics for safety stock placement in general acyclic supply chain networks ⋮ An approximation of the activity duration distribution in PERT. ⋮ A link between two-sided power and asymmetric Laplace distributions: with applications to mean and variance approximations ⋮ Chance-constrained programming in activity networks: A critical evaluation ⋮ Stochastic task networks -- trading performance for stability ⋮ Additive factors and stages of mental processes in task networks ⋮ On the fallacy of averages in project risk management ⋮ Computing bounds on the expected maximum of correlated normal variables ⋮ A path enumeration approach for the analysis of critical activities in fuzzy networks ⋮ Robust resource allocations in temporal networks ⋮ A dependent project evaluation and review technique: a Bayesian network approach ⋮ Critical path analysis in the network with fuzzy activity times ⋮ Persistence in discrete optimization under data uncertainty ⋮ On the latest starting times and criticality of activities in a network with imprecise durations ⋮ The computational complexity of the criticality problems in a network with interval activity times ⋮ Developing activity duration specification limits for effective project control ⋮ Stochastic networks and the extreme value distribution ⋮ Project bidding under deterministic and probabilistic activity durations ⋮ A distributionally robust analysis of the program evaluation and review technique ⋮ Solving a tropical optimization problem with application to optimal scheduling ⋮ Project Management Decisions with Uncertain Targets ⋮ A Decomposition Algorithm for Nested Resource Allocation Problems ⋮ A minmax regret approach to the critical path method with task interval times ⋮ A New Approach to Find Project Characteristics and Multiple Possible Critical Paths in a Fuzzy Project Network ⋮ Evaluating project completion time in project networks with discrete random activity durations ⋮ An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations ⋮ The model identification of beta distribution based on quantiles ⋮ DAGEN: A generator of testsets for project activity nets ⋮ Estimating the demand distributions of single-period items having frequent stockouts ⋮ Due-date quotation model for manufacturing system scheduling under uncertainty ⋮ A Generic Algorithm for Approximately Solving Stochastic Graph Optimization Problems ⋮ Stochastic and fuzzy PERT ⋮ Planning rolling stock maintenance: optimization of train arrival dates at a maintenance center ⋮ Maximizing the net present value of a project under uncertainty ⋮ Scheduling projects with stochastic activity duration to maximize expected net present value ⋮ Approximating the longest path length of a stochastic DAG by a normal distribution in linear time ⋮ Computing latest starting times of activities in interval-valued networks with minimal time lags ⋮ A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations ⋮ On criticality and sensitivity in activity networks ⋮ Improving project cost estimation by taking into account managerial flexibility ⋮ Managing risk-adjusted resource allocation for project time-cost tradeoffs ⋮ An upper bound on the expected completion time of PERT networks ⋮ On latest starting times and floats in activity networks with ill-known durations
This page was built for publication: Application of a Technique for Research and Development Program Evaluation