Developing activity duration specification limits for effective project control
From MaRDI portal
Recommendations
- Optimal timing of project control points
- Competence-based estimation of activity duration in IT projects
- Optimal project duration for resource leveling
- scientific article; zbMATH DE number 2106845
- scientific article; zbMATH DE number 4068718
- Bounds on Expected Project Tardiness
- Controlled alternative activity networks for project management
- Makespan minimization in projects with threshold activities
Cites work
- A Comparison Of Variance Reducing Techniques In Pert Simulations
- An uncertainty importance measure of activities in PERT networks
- Application of a technique for research and development program evaluation
- Criticality in Stochastic Networks
- Due date-based metrics for activity importance in stochastic activity networks
- scientific article; zbMATH DE number 3599820 (Why is no real title available?)
- On criticality and sensitivity in activity networks
- Sensitivity curves for effective project management
- The construction of stable project baseline schedules
Cited in
(12)- A nearest neighbour extension to project duration forecasting with artificial intelligence
- A buffer control method for top-down project control
- The impact of a limited budget on the corrective action taking process
- Using earned value management and schedule risk analysis with resource constraints for project control
- Determining the timing of project control points using a facility location model and simulation
- A Petri net-based framework for realistic project management and scheduling: an application in animation and videogames
- On-line control model for network construction projects
- Dynamic personnel rescheduling: insights and recovery strategies
- Analysis of the impact of corrective actions for stochastic project networks
- Project monitoring and control with an empirically grounded budget-release model
- Automatic selection of the best performing control point approach for project control with resource constraints
- Project bidding under deterministic and probabilistic activity durations
This page was built for publication: Developing activity duration specification limits for effective project control
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2503086)