Optimal timing of project control points
From MaRDI portal
Recommendations
- Determining the timing of project control points using a facility location model and simulation
- On-line control model for network construction projects
- scientific article; zbMATH DE number 3925673
- Formulation and solution of an optimal control problem for industrial project control
- On-line Control Model for Cost-simulation Network Projects
Cited in
(8)- Developing activity duration specification limits for effective project control
- A buffer control method for top-down project control
- Determining the timing of project control points using a facility location model and simulation
- The quantitative analysis of project objective flexible control based on entropy
- Formulation and solution of an optimal control problem for industrial project control
- Using the generalized maximum covering location model to control a project's progress
- A nearest neighbour extension to project duration forecasting with artificial intelligence
- scientific article; zbMATH DE number 2106845 (Why is no real title available?)
This page was built for publication: Optimal timing of project control points
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1590030)