Using the generalized maximum covering location model to control a project's progress
From MaRDI portal
Recommendations
- Determining the timing of project control points using a facility location model and simulation
- On-line control model for network construction projects
- On-line Control Model for Cost-simulation Network Projects
- Optimal timing of project control points
- Formulation and solution of an optimal control problem for industrial project control
Cites work
- A classification of predictive-reactive project scheduling procedures
- A maximal covering location model in the presence of partial coverage
- Determining the timing of project control points using a facility location model and simulation
- Disruption management for resource-constrained project scheduling
- Executing production schedules in the face of uncertainties: a review and some future directions
- On uncertainty, ambiguity, and complexity in project management
- Optimal timing of project control points
- PSPLIB -- a project scheduling problem library
- Reactive scheduling in the multi-mode RCPSP
- The generalized maximal covering location problem
- The gradual covering decay location problem on a network.
- The gradual covering problem
- Timing control points via simulation for production systems under random disturbances
This page was built for publication: Using the generalized maximum covering location model to control a project's progress
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2183555)