On-line control model for network construction projects
From MaRDI portal
Recommendations
- On-line Control Model for Cost-simulation Network Projects
- Time-cost trade-off via optimal control theory in Markov PERT networks
- Developing activity duration specification limits for effective project control
- Controlled alternative activity networks for project management
- A multi-objective resource allocation problem in dynamic PERT networks
Cited in
(7)- Optimal timing of project control points
- Using the generalized maximum covering location model to control a project's progress
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints
- Determining the timing of project control points using a facility location model and simulation
- A Petri net-based framework for realistic project management and scheduling: an application in animation and videogames
- On-line Control Model for Cost-simulation Network Projects
- Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach
This page was built for publication: On-line control model for network construction projects
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4367030)