PSPLIB
From MaRDI portal
Cited in
(only showing first 100 items - show all)- On project scheduling problem
- Evaluating project completion time in project networks with discrete random activity durations
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
- Simulated annealing and tabu search for multi-mode project payment scheduling
- A priority-rule method for project scheduling with work-content constraints
- A branch and bound algorithm for the resource-constrained project scheduling problem
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- DOGS-PFSP
- Insertion techniques for static and dynamic resource-constrained project scheduling.
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- Resource-constrained project scheduling: A critical activity reordering heuristic
- Lower bounds for resource-constrained project scheduling problems.
- On linear lower bounds for the resource constrained project scheduling problem.
- PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem
- Resource-constrained project scheduling: A survey of recent developments.
- A fuzzy robust scheduling approach for product development projects.
- Solving the resource-constrained project scheduling problem by a variable neighbourhood search.
- ProGen
- DAGEN
- PROGRESS
- LSSPER
- BDI-POMDP
- A linear programming and constraint propagation-based lower bound for the RCPSP
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- CHIP
- IBM ILOG CP optimizer for scheduling. 20+ years of scheduling with constraints at IBM/ILOG
- New strategies for stochastic resource-constrained project scheduling
- TTPLib
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints
- Computing project makespan distributions: Markovian PERT networks revisited
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap
- An exact composite lower bound strategy for the resource-constrained project scheduling problem
- A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem
- A branch and bound algorithm for project scheduling problem with spatial resource constraints
- Redundant cumulative constraints to compute preemptive bounds
- Lower bounds for the event scheduling problem with consumption and production of resources
- Optimal workforce assignment to operations of a paced assembly line
- How efficient is a global constraint in practice? A fair experimental framework
- An efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the resource constrained project scheduling problem
- An efficient particle swarm optimizer with application to man-day project scheduling problems
- A new approach to determine the critical path in stochastic activity network
- Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem
- Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem
- The preemptive stochastic resource-constrained project scheduling problem
- Designing a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysis
- Scatter Search
- A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling
- Towards merging binary integer programming techniques with genetic algorithms
- Optimizing version release dates of research and development long-term processes
- An effective heuristic for project scheduling with resource availability cost
- Generic negotiation mechanisms with side payments -- design, analysis and application for decentralized resource-constrained multi-project scheduling problems
- A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles
- Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems
- Optimal project duration for resource leveling
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem
- Enhanced energetic reasoning-based lower bounds for the resource constrained project scheduling problem
- An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
- On the generation of circuits and minimal forbidden sets
- Project scheduling under uncertainty: survey and research potentials
- Justification and RCPSP: a technique that pays
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling
- Gecode
- Tight LP bounds for resource constrained project scheduling
- An efficient time-windowing procedure for scheduling projects under multiple resource constraints
- Mixed-integer linear programming for resource leveling problems
- MineLib
- A modified PSO algorithm for minimizing the total costs of resources in MRCPSP
- The CLWS heuristic for single machine scheduling problem
- Using metaheuristics in multiobjective resource constrained project scheduling
- Planning horizons based proactive rescheduling for stochastic resource-constrained project scheduling problems
- Integrated scheduling and batch ordering for construction project
- Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem
- Improved selection in evolutionary multi-objective optimization of multi-skill resource-constrained project scheduling problem
- Revenue sharing for resource transfer among projects
- Using schedule risk analysis with resource constraints for project control
- A distributionally robust analysis of the program evaluation and review technique
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem
- BL data set
- A fuzzy robustness measure for the scheduling of commissioned product development projects
- Two-bar charts packing problem
- An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers
- A tree search heuristic for the resource constrained project scheduling problem with transfer times
- A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem
- Improved formulations and new valid inequalities for a hybrid flow shop problem with time-varying resources and chaining time-lag
- FULPAL
- A computational study of constraint programming approaches for resource-constrained project scheduling with autonomous learning effects
- A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints
- On the integration of diverging material flows into resource-constrained project scheduling
- A polyhedral study of event-based models for the resource-constrained project scheduling problem
- Optimizing temporary work and overtime in the time cost quality trade-off problem
- Using the generalized maximum covering location model to control a project's progress
- A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints
- The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds
- Considering project management activities for engineering design groups
- Negotiation mechanisms for the multi-agent multi-mode resource investment problem
- An approximate dynamic programming approach to project scheduling with uncertain resource availabilities
- Metaheuristics for multi-mode capital-constrained project payment scheduling
This page was built for software: PSPLIB