Optimizing version release dates of research and development long-term processes
From MaRDI portal
Recommendations
- Bi-criterion release time problem for a discrete SRGM under fuzzy environment
- A sequential software release policy
- Organizing product releases in time-driven development processes: a probabilistic analysis
- Optimal software release policies with simultaneous cost and reliability requirements
- A dynamic software release model
Cites work
- scientific article; zbMATH DE number 4135692 (Why is no real title available?)
- scientific article; zbMATH DE number 2144388 (Why is no real title available?)
- A branch and bound algorithm for scheduling projects to maximize net present value: The case of time dependent, contingent cash flows
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem
- A simulated annealing algorithm for resource constrained project scheduling problems
- A survey of variants and extensions of the resource-constrained project scheduling problem
- An improved particle swarm optimization algorithm for flowshop scheduling problem
- Cash Flows in Networks
- Complexity Results for Multiprocessor Scheduling under Resource Constraints
- Discrete-continuous project scheduling with discounted cash flows - a tabu search approach
- Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment
- Justification and RCPSP: a technique that pays
- Maximizing the net present value of a project under uncertainty
- Metaheuristics for multi-mode capital-constrained project payment scheduling
- Multi-mode project payment scheduling problems with bonus-penalty structure
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
- PSPLIB -- a project scheduling problem library
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
- Project network models with discounted cash flows a guided tour through recent developments
- Project scheduling. A research handbook.
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Scheduling Markovian PERT networks to maximize the net present value
- Scheduling project activities to maximize the net present value the case of linear time-dependent cash flows
- Scheduling projects with stochastic activity duration to maximize expected net present value
- Scheduling subject to resource constraints: Classification and complexity
- Search Heuristics for Resource Constrained Project Scheduling
- Simulated annealing and tabu search for multi-mode project payment scheduling
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
- The scheduling of activities to maximize the net present value of projects
Cited in
(5)- Directed particle swarm optimization with Gaussian-process-based function forecasting
- A multi-release software reliability modeling for open source software incorporating dependent fault detection process
- The next release problem: complexity, exact algorithms and computations
- Organizing product releases in time-driven development processes: a probabilistic analysis
- Monte Carlo within simulated annealing for integral constrained optimizations