Complexity Results for Multiprocessor Scheduling under Resource Constraints
From MaRDI portal
Cited in
(only showing first 100 items - show all)- Scheduling subject to resource constraints: Classification and complexity
- The complexity of the 0/1 multi-knapsack problem
- Scheduling tasks on two processors with deadlines and additional resources
- Minimizing mean flow time with parallel processors and resource constraints
- New trends in machine scheduling
- Solving the resource constrained deadline scheduling problem via reduction to the network flow problem
- NP-complete scheduling problems
- Resource constrained scheduling as generalized bin packing
- Bounds on list scheduling of UET tasks with restricted resource constraints
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application
- Parallel machine scheduling with earliness--tardiness penalties and additional resource con\-straints.
- An experimental analysis of local minima to improve neighbourhood search.
- On the complexity of coordinated display of multimedia objects
- Scheduling periodic tasks on uniform multiprocessors
- An approximation algorithm for nonpreemptive scheduling on hypercube parallel task systems
- Tabu search in audit scheduling
- An efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the resource constrained project scheduling problem
- Restricted assignment scheduling with resource constraints
- On the classes of interval graphs of limited nesting and count of lengths
- Some remarks on 3-partitions of multisets
- Optimizing version release dates of research and development long-term processes
- Mathematical models and decomposition methods for the multiple knapsack problem
- Algorithms for minimizing maximum lateness with unit length tasks and resource constraints
- Two simulated annealing-based heuristics for the job shop scheduling problem
- A linear time algorithm for restricted bin packing and scheduling problems
- Bin packing and multiprocessor scheduling problems with side constraint on job types
- Multi-parallel work centers scheduling optimization with shared or dedicated resources in low-volume low-variety production systems
- On \(k\)-partitions of multisets with equal sums
- Complexity of Lambek calculi with modalities and of total derivability in grammars
- Production, maintenance and resource scheduling: a review
- Path cover with minimum nontrivial paths and its application in two-machine flow-shop scheduling with a conflict graph
- On permutation schedules for two-machine flow shops with buffer constraints and constant processing times on one machine
- On optimal coverage of a tree with multiple robots
- Weighted total acquisition
- Upward point set embeddings of paths and trees
- Implementing mixed-criticality synchronous reactive programs upon uniprocessor platforms
- Enriched metaheuristics for the resource constrained unrelated parallel machine scheduling problem
- Extending partial representations of subclasses of chordal graphs
- Scheduling with an orthogonal resource constraint
- Parallel machine scheduling with additional resources: notation, classification, models and solution methods
- Small polyomino packing
- Jigsaw puzzles, edge matching, and polyomino packing: Connections and complexity
- New results in two identical machines scheduling with agreement graphs
- Shiftable intervals
- Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs
- Structure and complexity of extreme Nash equilibria
- Scheduling: agreement graph vs resource constraints
- An improved algorithm for parallel machine scheduling under additional resource constraints
- Allocation of partially renewable resources: Concept, capabilities, and applications
- Complexity of equilibrium in competitive diffusion games on social networks
- On the Scalability of Constraint Solving for Static/Off-Line Real-Time Scheduling
- Dissection with the fewest pieces is hard, even to approximate
- Bounds for the convergence time of local search in scheduling problems
- Output rate variation problem: some heuristic paradigms and dynamic programming
- Scheduling on Two Unbounded Resources with Communication Costs
- Do branch lengths help to locate a tree in a phylogenetic network?
- Towards optimal formwork pairing on construction sites
- Comparison of lower bounds to the lengths of deterministic multiprocessor schedules
- Minimizing the total weighted completion time of fully parallel jobs with integer parallel units
- Multitask n-vehicle exploration problem: complexity and algorithm
- NP-Complete operations research problems and approximation algorithms
- Solving multiple processor and multiple resource constrained scheduling problems using a genetic algorithm approach
- On the calendar planning problem with renewable resource
- Scheduling Opposing Forests
- TETRIS IS HARD, EVEN TO APPROXIMATE
- Approximation schemes for machine scheduling with resource (in-)dependent processing times
- scientific article; zbMATH DE number 7376042 (Why is no real title available?)
- Single machine group scheduling with family setups to minimize total tardiness
- Complexity of project scheduling problem with nonrenewable resources
- Very Large-Scale Neighborhoods with Performance Guarantees for Minimizing Makespan on Parallel Machines
- Treemaps for Directed Acyclic Graphs
- On the membership problem of permutation grammars -- a direct proof of NP-completeness
- Approximation algorithms for replenishment problems with fixed turnover times
- Realization problems on reachability sequences
- Fast parallel heuristics for the job shop scheduling problem
- Extending partial representations of circular-arc graphs
- Priority-based bin packing with subset constraints
- Bounding and computing obstacle numbers of graphs
- Mixed-model moving assembly line material placement optimization for a shorter time-dependent worker walking time
- Improved scheduling with a shared resource
- \( \gamma \)-clustering problems: classical and parametrized complexity
- A multi-objective flexible flow shop scheduling problem with an improved NSGA-II algorithm
- Distributed parallel build for the Isabelle archive of formal proofs
- Fifty years of research on resource-constrained project scheduling explored from different perspectives
- Dynamic batching of online arrivals to leverage economies of scale
- Scheduling on a stochastic number of machines
- Single machine scheduling with few deadlines
- A variant of multi-task \(n\)-vehicle exploration problem: maximizing every processor's average profit
- FPT implicit enumeration of active schedules
- Buffer management for colored packets with deadlines
- Bounding and computing obstacle numbers of graphs
- Partial and constrained level planarity
- Event-based MILP models for resource-constrained project scheduling problems
- Packing squares into a disk with optimal worst-case density
- Assortment optimization with visibility constraints
- Partitioning problems with splittings and interval targets
- Approximation algorithms for scheduling unrelated parallel machines
- Network flows and non-guillotine cutting patterns
- On the complexity of iterated shuffle
- Scheduling with conflicts: Online and offline algorithms
This page was built for publication: Complexity Results for Multiprocessor Scheduling under Resource Constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4140712)