Integrated scheduling and batch ordering for construction project
From MaRDI portal
Publication:1991384
DOI10.1016/J.APM.2013.07.017zbMath1427.90139OpenAlexW2003272240MaRDI QIDQ1991384
Publication date: 30 October 2018
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2013.07.017
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (4)
Survey of quantitative methods in construction ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Machine scheduling in production: a content analysis ⋮ Stochastic project scheduling with hierarchical alternatives
Uses Software
Cites Work
- An exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse
- Event-based MILP models for resource-constrained project scheduling problems
- PSPLIB -- a project scheduling problem library
- A hybrid genetic algorithm for the resource-constrained project scheduling problem
- Approximate analysis and optimization of batch ordering policies in capacitated supply chains
- Scheduling recurrent construction
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
This page was built for publication: Integrated scheduling and batch ordering for construction project