A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply
From MaRDI portal
(Redirected from Publication:6568413)
Cites work
- \(\Gamma\)-robust optimization of project scheduling problems
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times
- A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints
- A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem
- A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints
- A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem
- A high-performance exact method for the resource-constrained project scheduling problem
- A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem
- A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
- A robust genetic algorithm for resource allocation in project scheduling
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem
- A Sample Approximation Approach for Optimization with Probabilistic Constraints
- A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management
- A time-oriented branch-and-bound algorithm for resource-constrained project scheduling with generalised precedence constraints
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations
- An exact composite lower bound strategy for the resource-constrained project scheduling problem
- An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Efficient priority rules for the stochastic resource-constrained project scheduling problem
- scientific article; zbMATH DE number 1300399 (Why is no real title available?)
- Integrated scheduling and batch ordering for construction project
- Managing uncertainty in major equipment procurement in engineering projects
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints
- Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems
- Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies
- Multistage stochastic programming approach for joint optimization of job scheduling and material ordering under endogenous uncertainties
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing
- New strategies for stochastic resource-constrained project scheduling
- Probabilistic programming with discrete distributions and precedence constrained knapsack polyhedra
- Project scheduling cost optimization based on resource transfer costs and robustness
- Project scheduling under uncertainty: survey and research potentials
- Project-driven supply chains: integrating safety-stock and crashing decisions for recurrent projects
- PSPLIB -- a project scheduling problem library
- Robust decision trees for the multi-mode project scheduling problem with a resource investment objective and uncertain activity duration
- Scheduling subject to resource constraints: Classification and complexity
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty
- Tabu search for proactive project scheduling problem with flexible resources
- Time slack-based techniques for robust project scheduling subject to resource uncertainty
Cited in
(6)- Job scheduling integrated with material ordering: decision-dependent stochastic programming and information relaxation dual bounds
- A novel hyper-heuristic based on surrogate genetic programming for the three-dimensional spatial resource-constrained project scheduling problem under uncertain environments
- A three-dimensional spatial resource-constrained project scheduling problem: model and heuristic
- Multi-project scheduling and material ordering with time varying supplier capacities
- A low-carbon resource-constrained project scheduling problem with limited three-dimensional workspaces and its hierarchical deep reinforcement learning approach
- Budget allocation via data-driven distributionally robust probability maximization
This page was built for publication: A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6568413)