A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management
From MaRDI portal
Recommendations
- An adaptive crashing policy for stochastic time-cost tradeoff problems
- A two-stage stochastic programming approach for project planning with uncertain activity durations
- Optimal crashing of an activity network with disruptions
- An optimisation technique for crashing PERT network in project management
- Project crashing in the presence of general non-linear activity time reduction costs
Cited in
(30)- A survey on metaheuristics for stochastic combinatorial optimization
- Adaptive sample size and importance sampling in estimation-based local search for the probabilistic traveling salesman problem
- Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem
- Project scheduling under uncertainty: survey and research potentials
- Metaheuristic search techniques for multi-objective and stochastic problems: a history of the inventions of Walter J. Gutjahr in the past 22 years
- Optimal stochastic single-machine-tardiness scheduling by stochastic branch-and-bound
- Managing risk-adjusted resource allocation for project time-cost tradeoffs
- Optimal crashing of an activity network with disruptions
- Enriched workflow modelling and stochastic branch-and-bound
- A stochastic multimode model for time-cost tradeoffs under management flexibility
- Minorant methods of stochastic global optimization
- Scheduling interrelated activities in complex projects under high-order rework: a DSM-based approach
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming
- Bi-objective multi-mode project scheduling under risk aversion
- An adaptive crashing policy for stochastic time-cost tradeoff problems
- Min-max regret version of the linear time-cost tradeoff problem with multiple milestones and completely ordered jobs
- Time-cost trade-off analysis of project networks in fuzzy environments
- Modeling stochastic project time-cost trade-offs with time-dependent activity durations
- Distributionally robust project crashing with partial or no correlation information
- A hybrid path-relinking method for solving two-stage stochastic integer problems
- An optimisation technique for crashing PERT network in project management
- The contractor time–cost–credit trade‐off problem: integer programming model, heuristic solution, and business insights
- A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply
- Consensus-based algorithms for stochastic optimization problems
- Activity consolidation to improve responsiveness
- Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem
- Using a risk-based approach to project scheduling: a case illustration from semiconductor manufacturing
- A heuristic procedure for solving the dynamic probabilistic project expediting problem
- New fuzzy models for time-cost trade-off problem
- A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations
This page was built for publication: A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management