On the integration of diverging material flows into resource-constrained project scheduling
From MaRDI portal
Publication:2160494
DOI10.1016/J.EJOR.2022.03.047OpenAlexW4220712241MaRDI QIDQ2160494FDOQ2160494
Authors: Marco Gehring, Rebekka Volk, Frank Schultmann
Publication date: 3 August 2022
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2022.03.047
Cites Work
- PSPLIB -- a project scheduling problem library
- Project scheduling with inventory constraints
- Exact algorithms for inventory constrained scheduling on a single machine
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results
- Approximation algorithms for inventory constrained scheduling on a single machine
- Complexity of single machine scheduling subject to nonnegative inventory constraints
- Scheduling subject to resource constraints: Classification and complexity
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Batch scheduling in process industries: An application of resource-constrained project scheduling
- Title not available (Why is that?)
- Title not available (Why is that?)
- Scheduling of inventory releasing jobs to satisfy time-varying demand: an analysis of complexity
- Critical-Path Planning and Scheduling: Mathematical Basis
- IBM ILOG CP optimizer for scheduling. 20+ years of scheduling with constraints at IBM/ILOG
- Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production
- Continuous filling and emptying of storage systems in constraint-based scheduling
- Planning and scheduling in the process industry
- Scheduling batches in flowshop with limited buffers in the shampoo industry
- Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling
- A hybrid method for large-scale short-term scheduling of make-and-pack production processes
- Scheduling of continuous and discontinuous material flows with intermediate storage restrictions
- LP-based heuristics for scheduling chemical batch processes
- The project scheduling problem with production and consumption of resources: a list-scheduling based algorithm
- A complex time based construction heuristic for batch scheduling problems in the chemical industry
- Active and stable project scheduling
- Lower bounds for the event scheduling problem with consumption and production of resources
- Minimizing makespan on a single machine with release dates and inventory constraints
- The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds
Cited In (1)
Uses Software
This page was built for publication: On the integration of diverging material flows into resource-constrained project scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2160494)