Scheduling batches in flowshop with limited buffers in the shampoo industry
From MaRDI portal
Publication:2253374
Recommendations
- Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times.
- Flowshop sequencing problems with limited buffer storage
- scientific article; zbMATH DE number 764416
- A TWO-STAGE FLOWSHOP SCHEDULING WITH LIMITED BUFFER STORAGE
- Formulations and heuristics for scheduling in a buffer-constrained flowshop and flowline-based manufacturing cell with different buffer-space requirements for jobs: Part 1
Cites work
- A survey of scheduling problems with setup times or costs
- An ant colony optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem
- Ant colony optimization.
- Assignment Problems
- Fixed interval scheduling: models, applications, computational complexity and algorithms
- FLOWSHOP SCHEDULES WITH SEQUENCE DEPENDENT SETUP TIMES
- Flowshop scheduling with limited temporary storage
- Interval scheduling: A survey
- Multicriteria scheduling problems: a survey
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Simple heuristics for scheduling with limited intermediate storage
- Single machine batch scheduling problem with family setup times and release dates to minimize makespan
- The scheduling problem where multiple machines compete for a common local buffer
Cited in
(7)- On the integration of diverging material flows into resource-constrained project scheduling
- A hybrid method for large-scale short-term scheduling of make-and-pack production processes
- Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption
- Flowshop sequencing problems with limited buffer storage
- Multiproduct batching and scheduling with buffered rework: the case of a car paint shop
- Scheduling two interfering job sets on identical parallel machines with makespan and total completion time minimization
- A unified solution framework for flexible job shop scheduling problems with multiple resource constraints
This page was built for publication: Scheduling batches in flowshop with limited buffers in the shampoo industry
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2253374)