Integration of routing into a resource-constrained project scheduling problem
DOI10.1007/S13675-018-0104-ZzbMATH Open1437.90079OpenAlexW2897633320MaRDI QIDQ2175371FDOQ2175371
Authors: Philippe Lacomme, A. Moukrim, Marina Vinot, Alain Quilliot
Publication date: 29 April 2020
Published in: EURO Journal on Computational Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s13675-018-0104-z
Recommendations
- The resource transfer problem. A framework for integrated scheduling and routing problems. With a foreword by Christoph Schwindt
- A survey of variants and extensions of the resource-constrained project scheduling problem
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
- A constraint programming approach for the resource-constrained project scheduling problem
- scientific article; zbMATH DE number 1264426
Deterministic scheduling theory in operations research (90B35) Transportation, logistics and supply chain management (90B06)
Cites Work
- Network flows. Theory, algorithms, and applications.
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- A survey of variants and extensions of the resource-constrained project scheduling problem
- A simple and effective evolutionary algorithm for the vehicle routing problem
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
- Scheduling subject to resource constraints: Classification and complexity
- Insertion techniques for static and dynamic resource-constrained project scheduling.
- Resource-constrained project scheduling: A survey of recent developments.
- A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Applying tabu search to the job-shop scheduling problem
- A flow-based tabu search algorithm for the RCPSP with transfer times
- Job Shop Scheduling by Simulated Annealing
- A Fast Taboo Search Algorithm for the Job Shop Problem
- Greedy randomized adaptive search procedures
- Efficient frameworks for greedy split and new depth first search split procedures for routing problems
- The project scheduling polyhedron: Dimension, facets and lifting theorems
- Title not available (Why is that?)
- Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars
- Competitive memetic algorithms for arc routing problems
- An MILP for scheduling problems in an FMS with one vehicle
- A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times
- Title not available (Why is that?)
- Analysis of the dial-a-ride problem of Hunsaker and Savelsbergh
- An efficient new heuristic for the hoist scheduling problem
- Discrete time/cost trade-offs in project scheduling with time-switch constraints
- Scheduling UET task systems with concurrency on two parallel identical processors
Cited In (5)
- Solving the integrated multi-period scheduling routing problem for cleaning debris in the aftermath of disasters
- A review on integrated scheduling and outbound vehicle routing problems
- The resource transfer problem. A framework for integrated scheduling and routing problems. With a foreword by Christoph Schwindt
- Flexible job-shop scheduling with transportation resources
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
This page was built for publication: Integration of routing into a resource-constrained project scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2175371)