Solving the integrated multi-period scheduling routing problem for cleaning debris in the aftermath of disasters
From MaRDI portal
Publication:2106726
Recommendations
- The post-disaster debris clearance problem under incomplete information
- Solution methodologies for debris removal in disaster response
- Minimizing latency in post-disaster road clearance operations
- Integrated optimal scheduling of repair crew and relief vehicle after disaster
- Integrated optimal scheduling and routing of repair crew and relief vehicles after disaster: a novel hybrid solution approach
Cites work
- scientific article; zbMATH DE number 193993 (Why is no real title available?)
- A branch-and-Benders-cut algorithm for the crew scheduling and routing problem in road restoration
- A hybrid heuristic algorithm for the open-pit-mining operational planning problem
- A survey of dynamic network flows
- A survey of recent research on location-routing problems
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Algorithms for the Vehicle Routing and Scheduling Problems with Time Window Constraints
- An adaptive large neighborhood search for the full truckload pickup and delivery problem with resource synchronization
- Integer Programming Formulation of Traveling Salesman Problems
- Integrated optimal scheduling of repair crew and relief vehicle after disaster
- Integration of routing into a resource-constrained project scheduling problem
- Multi-vehicle synchronized arc routing problem to restore post-disaster network connectivity
- Multicommodity network flows: a survey. I: Applications and formulations
- Multiple vehicle synchronisation in a full truck-load pickup and delivery problem: a case-study in the biomass supply chain
- Network repair crew scheduling and routing for emergency relief distribution problem
- OR/MS research in disaster operations management
- Probability distribution of solution time in GRASP: an experimental investigation
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Road network emergency accessibility planning after a major earthquake
- Scheduling subject to resource constraints: Classification and complexity
- TTT plots: a perl program to create time-to-target plots
- The post-disaster debris clearance problem under incomplete information
- The split delivery vehicle routing problem: A survey
- The vehicle routing problem. Latest advances and new challenges.
- Vehicle routing with full loads
Cited in
(3)
This page was built for publication: Solving the integrated multi-period scheduling routing problem for cleaning debris in the aftermath of disasters
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2106726)