Multi-vehicle synchronized arc routing problem to restore post-disaster network connectivity
From MaRDI portal
Publication:1752846
Transportation, logistics and supply chain management (90B06) Deterministic network models in operations research (90B10) Mixed integer programming (90C11) Combinatorial optimization (90C27) Programming involving graphs or networks (90C35) Approximation methods and heuristics in mathematical programming (90C59)
Recommendations
- Multi-vehicle prize collecting arc routing for connectivity problem
- Routing multiple work teams to minimize latency in post-disaster road network restoration
- Minimizing latency in post-disaster road clearance operations
- Integrated optimal scheduling and routing of repair crew and relief vehicles after disaster: a novel hybrid solution approach
- A greedy randomized adaptive search procedure (GRASP) for the multi-vehicle prize collecting arc routing for connectivity problem
Cites work
- A GRASP metaheuristic to improve accessibility after a disaster
- A hierarchical compromise model for the joint optimization of recovery operations and distribution of emergency goods in Humanitarian logistics
- A Tabu Search Heuristic for the Capacitated arc Routing Problem
- An algorithm for the Rural Postman problem on a directed graph
- Arc Routing
- Arc Routing Problems, Part II: The Rural Postman Problem
- Improvement Procedures for the Undirected Rural Postman Problem
- Min-Max K-vehicles windy rural postman problem
- Optimal scheduling of emergency roadway repair and subsequent relief distribution
- Synchronized arc routing for snow plowing operations
- The post-disaster debris clearance problem under incomplete information
- The rural postman problem on directed, mixed, and windy graphs
- The synchronized arc and node routing problem: application to road marking
Cited in
(25)- Multi-vehicle prize collecting arc routing for connectivity problem
- A branch-and-Benders-cut algorithm for the crew scheduling and routing problem in road restoration
- Minimizing latency in post-disaster road clearance operations
- Incomplete information imputation in limited data environments with application to disaster response
- A multi-objective distributionally robust model for sustainable last mile relief network design problem
- Abstract network flow with intermediate storage for evacuation planning
- Solving the integrated multi-period scheduling routing problem for cleaning debris in the aftermath of disasters
- A multi-objective humanitarian pickup and delivery vehicle routing problem with drones
- Synchronizing victim evacuation and debris removal: a data-driven robust prediction approach
- A greedy randomized adaptive search procedure (GRASP) for the multi-vehicle prize collecting arc routing for connectivity problem
- Decomposition-based algorithms for the crew scheduling and routing problem in road restoration
- Robust post-disaster route restoration
- Endogenous stochastic optimisation for relief distribution assisted with unmanned aerial vehicles
- Weighted online minimum latency problem with edge uncertainty
- Integrating location and network restoration decisions in relief networks under uncertainty
- Routing multiple work teams to minimize latency in post-disaster road network restoration
- A critical survey on the network optimization algorithms for evacuation planning problems
- Metaheuristics for the work‐troops scheduling problem
- Arc routing problems: A review of the past, present, and future
- Integrated reinforcement and repair of interdependent infrastructure networks under disaster-related uncertainties
- Integrated optimal scheduling and routing of repair crew and relief vehicles after disaster: a novel hybrid solution approach
- Learn to decompose multiobjective optimization models for large‐scale networks
- An updated annotated bibliography on arc routing problems
- A hybrid and adaptive evolutionary approach for multitask optimization of post-disaster traveling salesman and repairman problems
- The resource-constrained project scheduling problem for risk reduction after industrial disasters involving dangerous substances
This page was built for publication: Multi-vehicle synchronized arc routing problem to restore post-disaster network connectivity
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1752846)