An efficient new heuristic for the hoist scheduling problem
From MaRDI portal
Recommendations
- An algorithm for hoist scheduling problems
- An improved hybrid model for the generic hoist scheduling problem
- An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times
- Heuristic for a new multiobjective scheduling problem
- scientific article; zbMATH DE number 1437392
- Robust optimization for the cyclic hoist scheduling problem
- A solution for cyclic scheduling of multi-hoists without overlapping
- Optimal Cyclic Multi-Hoist Scheduling: A Mixed Integer Programming Approach
- scientific article; zbMATH DE number 1488070
Cites work
- A bounding scheme for deriving the minimal cycle time of a single- transporter \(N\)-stage process with time-window constraints
- An algorithm for hoist scheduling problems
- Control of an electroplating line in the max and min algebras
- Crane scheduling with time windows in circuit board production lines
- Optimal Cyclic Multi-Hoist Scheduling: A Mixed Integer Programming Approach
- Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times
- Robust optimization for the cyclic hoist scheduling problem
- Single hoist cyclic scheduling with multiple tanks: A material handling solution
- The relationship between the physical layout of the work stations and the productivity of a saturated single-hoist production line
- Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance
Cited in
(11)- Bi-objective speed-scaling robotic cell scheduling with peak power consumption constraint
- Cyclic robot scheduling for 3D printer-based flexible assembly systems
- An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times
- Integration of routing into a resource-constrained project scheduling problem
- Resolution Of The Cyclic Multi-Hoists Scheduling Problem With Overlapping Partitions
- Single-track multi-hoist scheduling problem: a collision-free resolution based on a branch-and-bound approach
- Scheduling in manufacturing with transportation: classification and solution techniques
- An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem
- An improved hybrid model for the generic hoist scheduling problem
- INEH-VNS algorithm solved automatic production system scheduling problem under just-in-time environment
- Mixed-integer linear programming method for multi-degree and multi-hoist cyclic scheduling with time windows
This page was built for publication: An efficient new heuristic for the hoist scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q342278)