Crane scheduling with time windows in circuit board production lines
From MaRDI portal
Publication:4398967
DOI10.1080/00207549508930203zbMATH Open0916.90124OpenAlexW1972637367WikidataQ126251258 ScholiaQ126251258MaRDI QIDQ4398967FDOQ4398967
Authors:
Publication date: 30 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549508930203
Recommendations
Cites Work
- Algorithms for the Vehicle Routing and Scheduling Problems with Time Window Constraints
- On the worst-case performance of some heuristics for the vehicle routing and scheduling problem with time window constraints
- An Optimization-Based Heuristic for Vehicle Routing and Scheduling with Soft Time Window Constraints
- Vehicle Routing with Time Windows
- The Minimum Common-Cycle Algorithm for Cyclic Scheduling of Two Material Handling Hoists with Time Window Constraints
- Semi-Markov decision models for real-time scheduling
Cited In (6)
- Multi-objective scheduling method for workshop cranes based on projection model of trajectories
- Optimal cyclic single crane scheduling for two parallel train oilcan repairing lines
- A branch-and-cut algorithm for factory crane scheduling problem
- Scheduling multiple factory cranes on a common track
- An efficient and fast local search based heuristic for reel management in a production line of oil extraction pipes
- An efficient new heuristic for the hoist scheduling problem
This page was built for publication: Crane scheduling with time windows in circuit board production lines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4398967)