Crane scheduling with time windows in circuit board production lines
From MaRDI portal
Publication:4398967
Recommendations
Cites work
- Algorithms for the Vehicle Routing and Scheduling Problems with Time Window Constraints
- An Optimization-Based Heuristic for Vehicle Routing and Scheduling with Soft Time Window Constraints
- On the worst-case performance of some heuristics for the vehicle routing and scheduling problem with time window constraints
- Semi-Markov decision models for real-time scheduling
- The Minimum Common-Cycle Algorithm for Cyclic Scheduling of Two Material Handling Hoists with Time Window Constraints
- Vehicle Routing with Time Windows
Cited in
(6)- Multi-objective scheduling method for workshop cranes based on projection model of trajectories
- Optimal cyclic single crane scheduling for two parallel train oilcan repairing lines
- A branch-and-cut algorithm for factory crane scheduling problem
- Scheduling multiple factory cranes on a common track
- An efficient and fast local search based heuristic for reel management in a production line of oil extraction pipes
- An efficient new heuristic for the hoist scheduling problem
This page was built for publication: Crane scheduling with time windows in circuit board production lines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4398967)