Crane scheduling with spatial constraints
From MaRDI portal
Recommendations
- Crane scheduling with non-crossing constraint
- A m‐parallel crane scheduling problem with a non‐crossing constraint
- The crane scheduling problem: models and solution approaches
- A tabu search heuristic for the quay crane scheduling problem
- A fast heuristic for quay crane scheduling with interference constraints
Cited in
(40)- A survey of berth allocation and quay crane scheduling problems in container terminals
- A Benders decomposition-based framework for solving quay crane scheduling problems
- MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem
- A generalized classification scheme for crane scheduling with interference
- Scheduling quay cranes and yard trucks for unloading operations in container ports
- The quay crane scheduling problem with non-crossing and safety clearance constraints: an exact solution approach
- Approximate the scheduling of quay cranes with non-crossing constraints
- The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion
- Modeling and solving rich quay crane scheduling problems
- Modelling and metaheuristic for gantry crane scheduling and storage space allocation problem in railway container terminals
- Compact ILP formulations for a class of solutions to berth allocation and quay crane scheduling problems
- An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem
- A fast heuristic for quay crane scheduling with interference constraints
- Multiple crane scheduling in a batch annealing process with no-delay constraints for machine unloading
- Double girder bridge crane with double cycling: scheduling strategy and performance evaluation
- The crane scheduling problem: models and solution approaches
- Operations research at container terminals: a literature update
- Improved tabu search heuristics for the dynamic space allocation problem
- Modeling and solution of the joint quay crane and truck scheduling problem
- Assignment of floating bulk handling cranes by bee colony optimization in inland waterways
- Scheduling cranes at an indented berth
- Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals
- Cooperative twin-crane scheduling
- A heuristic for the quay crane scheduling problem based on contiguous bay crane operations
- Crane scheduling with non-crossing constraint
- Vehicle Routing Problems and Container Terminal Operations – An Update of Research
- AN EFFICIENT OPTIMAL SOLUTION OF A TWO-CRANE SCHEDULING PROBLEM
- Crane scheduling with time windows in circuit board production lines
- Memetic algorithm for crane scheduling problem in slab yard with spatial and temporal constraints
- A m‐parallel crane scheduling problem with a non‐crossing constraint
- Principles and Practice of Constraint Programming – CP 2004
- Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model
- Solving the yard crane scheduling problem with dynamic assignment of input/output points
- CLSS: An intelligent crane lorry scheduling system
- Advances in multi-crane scheduling: extended non-interference modeling and temporal-constraint-based valid inequalities
- A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules
- A tabu search heuristic for the quay crane scheduling problem
- A branch-and-cut algorithm for factory crane scheduling problem
- On-line scheduling with non-crossing constraints
- Simulation-based optimization for discharge/loading operations at a maritime container terminal
This page was built for publication: Crane scheduling with spatial constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3156730)