Cooperative twin-crane scheduling
From MaRDI portal
Publication:335329
Recommendations
- A cooperative approach to dispatching and scheduling twin-yard cranes in container terminals
- An exact solution approach for scheduling cooperative gantry cranes
- Scheduling cooperative gantry cranes with seaside and landside jobs
- Twin-crane scheduling during seaside workload peaks with a dedicated handshake area
- Optimally scheduling interfering and non-interfering cranes
- AN EFFICIENT OPTIMAL SOLUTION OF A TWO-CRANE SCHEDULING PROBLEM
- Synchronous scheduling optimization for dual automated stacking crane with interference at automated container terminals
- Scheduling co-operating stacking cranes with predetermined container sequences
- Crane scheduling with spatial constraints
Cites Work
- scientific article; zbMATH DE number 3497315 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 194544 (Why is no real title available?)
- A Production Line that Balances Itself
- A decomposition heuristic for the twin robots scheduling problem
- A generalized classification scheme for crane scheduling with interference
- AN EFFICIENT OPTIMAL SOLUTION OF A TWO-CRANE SCHEDULING PROBLEM
- Advanced methods for container stacking
- Container terminal operation and operations research -- a classification and literature review
- Effects of storage block layout and automated yard crane systems on the performance of seaport container terminals
- Feature Article—Genetic Algorithms for the Operations Researcher
- Generating scenarios for simulation and optimization of container terminal logistics
- Job Shop Scheduling by Simulated Annealing
- Operations research at container terminals: a literature update
- Optimization by simulated annealing
- Performance of Bucket Brigades When Work Is Stochastic
- Real-time scheduling for twin RMGs in an automated container yard
- Scheduling co-operating stacking cranes with predetermined container sequences
- Scheduling just-in-time part supply for mixed-model assembly lines
- Scheduling multiple factory cranes on a common track
- Scheduling twin robots on a line
Cited In (14)
- Exact duality transformations for sigma models and gauge theories
- Approximation algorithms for the twin robot scheduling problem
- Optimizing the number of deployed yard cranes in a container terminal
- AN EFFICIENT OPTIMAL SOLUTION OF A TWO-CRANE SCHEDULING PROBLEM
- A geometric renormalization group in discrete quantum space–time
- Scheduling ASC and AGV considering direct, buffer, and hybrid modes for transferring containers
- A decomposition-based approach to the scheduling of identical automated yard cranes at container terminals
- Pallet location and job scheduling in a twin-robot system
- Routing two stacking cranes with predetermined container sequences
- Scheduling co-operating stacking cranes with predetermined container sequences
- A cooperative approach to dispatching and scheduling twin-yard cranes in container terminals
- Scheduling cooperative gantry cranes with seaside and landside jobs
- An exact solution approach for scheduling cooperative gantry cranes
- Twin-crane scheduling during seaside workload peaks with a dedicated handshake area
This page was built for publication: Cooperative twin-crane scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q335329)