Synchronous scheduling optimization for dual automated stacking crane with interference at automated container terminals
From MaRDI portal
Publication:3307677
zbMATH Open1449.90122MaRDI QIDQ3307677FDOQ3307677
Authors: Yaozong Wang, Zhi-Hua Hu
Publication date: 12 August 2020
Recommendations
- Scheduling automated triple cross-over stacking cranes in a container yard
- Scheduling co-operating stacking cranes with predetermined container sequences
- Interference aware scheduling of triple-crossover-cranes
- Crane scheduling in container yards with inter-crane interference
- Routing two stacking cranes with predetermined container sequences
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Mixed integer programming (90C11)
Cited In (6)
- A differential evolution algorithm for twin ASC scheduling problem
- Scheduling automated triple cross-over stacking cranes in a container yard
- Optimization for integrated scheduling of intelligent handling equipment with bidirectional flows and limited buffers at automated container terminals
- Cooperative twin-crane scheduling
- Optimizing container movements using one and two automated stacking cranes
- Real-time scheduling for twin RMGs in an automated container yard
This page was built for publication: Synchronous scheduling optimization for dual automated stacking crane with interference at automated container terminals
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3307677)