Scheduling co-operating stacking cranes with predetermined container sequences
From MaRDI portal
Publication:908295
DOI10.1016/j.dam.2015.07.042zbMath1336.90009OpenAlexW1927383638MaRDI QIDQ908295
Dirk Briskorn, Panagiotis Angeloudis
Publication date: 4 February 2016
Published in: Discrete Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.dam.2015.07.042
schedulingefficient algorithmcontainer terminalsautomated stacking cranesshortest path representation
Transportation, logistics and supply chain management (90B06) Inventory, storage, reservoirs (90B05)
Related Items
Twin-crane scheduling during seaside workload peaks with a dedicated handshake area, Cooperative twin-crane scheduling, A stochastic model for the throughput analysis of passing dual yard cranes, Interference aware scheduling of triple-crossover-cranes, A generalized classification scheme for crane scheduling with interference, A decomposition-based approach to the scheduling of identical automated yard cranes at container terminals, Scheduling dedicated jobs with variative processing times, Routing two stacking cranes with predetermined container sequences
Cites Work
- Crane scheduling in container yards with inter-crane interference
- Scheduling automated triple cross-over stacking cranes in a container yard
- Discrete time model and algorithms for container yard crane scheduling
- An efficient algorithm for the job-shop problem with two jobs
- Container terminal operation and operations research -- a classification and literature review
- Operations research at container terminals: a literature update
- Survey of research in the design and control of automated guided vehicle systems
- Scheduling of Container Storage and Retrieval
- A Geometric Model and a Graphical Algorithm for a Sequencing Problem