A generalized classification scheme for crane scheduling with interference

From MaRDI portal
Publication:1698922

DOI10.1016/j.ejor.2016.08.041zbMath1380.90108OpenAlexW2513901659MaRDI QIDQ1698922

Frank Meisel, Dirk Briskorn, Nils Boysen

Publication date: 16 February 2018

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2016.08.041




Related Items (26)

Optimizing the number of deployed yard cranes in a container terminalScheduling electric vehicles and locating charging stations on a pathGantry crane and shuttle car scheduling in modern rail-rail transshipment yardsWhen road trains supply freight trains: scheduling the container loading process by gantry crane between multi-trailer trucks and freight trainsTwin-crane scheduling during seaside workload peaks with a dedicated handshake areaCooperative twin-crane schedulingMinimum cost noncrossing flow problem on layered networksCombining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vesselPallet location and job scheduling in a twin-robot systemPredicting the optimal period for Cyclic Hoist Scheduling ProblemsScheduling ASC and AGV considering direct, buffer, and hybrid modes for transferring containersMinimum cost flow problem with conflictsSolving the single crane scheduling problem at rail transshipment yardsMIP approaches for the integrated berth allocation and quay crane assignment and scheduling problemSolving real-world sized container pre-marshalling problems with an iterative deepening branch-and-bound algorithmInterference aware scheduling of triple-crossover-cranesModels and algorithms for a yard crane scheduling problem in container portsThe quay crane scheduling problem with non-crossing and safety clearance constraints: an exact solution approachAn exact solution approach for scheduling cooperative gantry cranesTime-consistent portfolio optimizationLevelling crane workload in multi-yard rail-road container terminalsThe traveling salesman puts-on a hard hat -- tower crane scheduling in construction projectsA decomposition-based approach to the scheduling of identical automated yard cranes at container terminalsApproximation algorithms for the twin robot scheduling problemRouting two stacking cranes with predetermined container sequencesExploring search space trees using an adapted version of Monte Carlo tree search for combinatorial optimization problems


Uses Software


Cites Work


This page was built for publication: A generalized classification scheme for crane scheduling with interference